Live Chat +91 96259 41599
Environmental Law Guide

CGWA Notice for Groundwater Extraction: How to Respond

Got a CGWA notice for groundwater extraction? What each type of notice means, how to draft the reply, documents to attach, sealing and the NGT appeal route.

Written by the environmental law practice of Advocate BK Singh, which acts before the pollution boards, environment authorities and the National Green Tribunal.

Get A Free Consultation

Last reviewed: October 2026

Reply in writing, inside the time the notice gives, and answer each allegation with documents. First work out what kind of notice it is: extraction without a NOC, breach of NOC conditions such as meters or recharge, an expired NOC, a compensation demand, or a direction to stop and seal. Then decide which facts you contest and which gaps you are already fixing. Ask for a personal hearing. If a final direction to seal or pay is passed, an appeal lies to the National Green Tribunal within 30 days of the order reaching you.

Short answer: Read the notice for its date, deadline and exact allegation, then reply in writing before the deadline with your NOC, meter readings, water bills, recharge records and compliance reports. Admit what is true, show what you have fixed, ask for a hearing, and keep proof of delivery. A final sealing or compensation order can be appealed to the NGT within 30 days.

This guide is for factories, hotels, hospitals, builders, housing societies, schools and other bulk users who have received a notice from the Central Ground Water Authority, a state groundwater authority or the district administration about their borewells. It covers reading the notice, drafting the reply, the hearing, sealing and the appeal. For the bigger picture on groundwater extraction disputes, see our main page.

If you are not yet sure whether you needed a NOC at all, start with our short explainer on groundwater NOC exemptions, then come back here.

Reply timeAs stated in the notice; ask in writing for more time before it expires
Legal basisDirections under the Environment (Protection) Act 1986
Appeal against a directionNGT under section 16, 30 days from communication (plus up to 60 days)
Never do thisBreak a seal or run a sealed borewell

हिंदी में सारांश

अगर आपको CGWA या राज्य भूजल प्राधिकरण से बोरवेल को लेकर नोटिस मिला है, तो घबराएं नहीं, पर उसे नज़रअंदाज़ भी न करें। पहले देखें कि नोटिस किस बारे में है: बिना NOC भूजल निकालना, मीटर या रिचार्ज जैसी NOC शर्तों का पालन न करना, NOC की अवधि खत्म होना, पर्यावरण क्षतिपूर्ति की मांग, या बोरवेल बंद और सील करने का निर्देश। तय समय के अंदर लिखित जवाब दें, NOC, मीटर रीडिंग, पानी के बिल, रिचार्ज और अनुपालन रिपोर्ट लगाएं, और व्यक्तिगत सुनवाई मांगें। सील कभी न तोड़ें। अंतिम आदेश के खिलाफ 30 दिन के अंदर NGT में अपील हो सकती है।

In short

The essentials

Mark the deadline today

Note when the notice reached you and the reply date, and ask for more time in writing if you need it.

Identify the allegation

No NOC, breach of conditions, expiry and compensation each need a different reply.

Answer with paper

Meter logs, bills, recharge photos and compliance reports carry far more weight than assurances.

Ask to be heard

A personal hearing lets you explain gaps that look worse on paper than they are.

Respect the seal

Running a sealed borewell turns a fixable notice into a much more serious case.

30 days to appeal

A final direction under the EP Act can be challenged before the NGT within 30 days.

The main question

I have received a CGWA notice about my borewell. What should I do first?

Do three things on the first day. Write down the date the notice reached you, because every later time limit runs from it. Read the notice for what it actually alleges, not what you fear it alleges. And collect every groundwater document your unit has: the NOC or application, meter readings, water bills, recharge structure records and any compliance report you filed.

Most notices are show-cause notices. They tell you what the authority believes is wrong and give you a chance to explain before it decides. A good reply at this stage often ends the matter or reduces it to a compliance timeline. A missed deadline, on the other hand, usually leads to an order passed on the authority's version alone, and that is much harder to undo.

Know your notice

What kind of groundwater notice have you received?

Groundwater notices fall into a handful of types. The reply depends on which one you are holding, and some notices combine two or three.

Type of noticeWhat it usually saysWhat your reply must show
Extraction without NOCYou are drawing groundwater for industrial, commercial, infrastructure or bulk use without permissionThat you are exempt, that an application was pending, or that you have stopped and applied
Breach of NOC conditionsMeter not installed or not working, no telemetry, no piezometer, recharge structures missing, reports not filedEach condition, item by item, with dated proof of compliance or a short timeline
Expired NOCYour NOC lapsed and renewal was not applied for in timeRenewal application date, acknowledgement, and extraction within the old permitted quantity
Compensation demandEnvironmental compensation for illegal extraction or non-compliance over a stated periodErrors in the period, volume, category of area or calculation
Direction to stop or sealStop extraction and seal borewells, often under section 5 of the EP ActCompliance, a request for revocation, and if needed an appeal
Notice from DM or state authorityAction under state groundwater law or as an officer authorised by the CGWAThe same, plus a check that this office has the power it claims

A notice from the State Pollution Control Board can also raise groundwater, because consent orders often make a valid groundwater NOC a condition. That notice is answered to the board, but the underlying fix is still the groundwater permission.

First check

Is the CGWA even the right authority for my unit?

Check this before anything else. The CGWA regulates groundwater extraction across most of India, but several states, including Uttar Pradesh, Haryana and Punjab, regulate it under their own laws and authorities. If your unit sits in such a state, the permission and the enforcement normally come from the state body. A notice from the wrong authority is not something to ignore, but it changes what you write and where you apply.

Next, check whether you needed permission at all. Individual domestic users and agricultural users are exempt under the CGWA guidelines, and some small users are exempt too, subject to conditions. Industries, hotels, hospitals, group housing societies, malls, infrastructure projects, mining units and packaged water units generally need a NOC. If you believe you fall within an exemption, the reply must say which one and why, with figures for your daily use.

Finally, look at the period and the location. The category of your assessment unit (safe, semi-critical, critical or over-exploited) affects what conditions apply and how compensation is worked out. Units are reclassified from time to time. A notice that applies today's category to a period when your block was classified differently is open to challenge.

Step by step

How to draft and file your reply to a CGWA notice

This is the order that works in practice. Do not skip the first two steps to save time; most weak replies fail because they answer the wrong question.

1

Note the dates

Record the date on the notice, the date it reached you and the reply deadline. If the time is too short to collect documents, write before it expires asking for a specific extension.

2

List each allegation

Break the notice into numbered allegations. Your reply will answer them in the same order, so the officer can see nothing has been dodged.

3

Get the inspection record

If the notice refers to an inspection, ask for a copy of the inspection report and any photos. If they are not given, file an RTI. You cannot answer findings you have not seen.

4

Collect your documents

NOC, application acknowledgements, meter readings and calibration, telemetry data, piezometer records, recharge structure photos and invoices, water bills from any municipal or tanker supply, and filed compliance reports.

5

Write a factual reply

Start with a short background of the unit and its water use. Then answer each allegation: admitted, denied or partly admitted, with the document that proves it. Keep opinions and complaints about officers out.

6

Offer a compliance plan

Where something is genuinely missing, say what you have already done and give a dated timeline for the rest. Firm dates are far more convincing than promises.

7

Ask for a hearing

Request a personal hearing before any adverse order. Mention any legal objection, such as a wrong authority or a wrong period, so it is on record.

8

Deliver with proof

Submit through the authority's online system if one is specified, and also by email or speed post. Keep the acknowledgement with the file.

Sign the reply by someone who can actually answer for the facts, usually the occupier, a director or a partner, and keep it consistent with whatever you have told the pollution board in consent applications. Inconsistent figures for water use across two authorities are among the first things an officer notices.

If you had no permission

What should I write if we really were extracting without a NOC?

Be honest and practical. Denying something that the inspection photographed only damages your credibility. Accept the gap, explain how it happened in two or three sentences (for example, the borewell came with the premises, or a consultant told you the unit was exempt), and show what you have done since: extraction stopped or reduced, an application filed, meters ordered, recharge work started.

Then address the period. Compensation is usually worked out on the number of days and the volume extracted, so it matters when the violation really began and ended. If you bought the premises recently, if the bore was defunct for months, or if you switched to municipal supply at some point, say so and attach proof. A shorter, documented period means a smaller figure.

If you had permission

What if we hold a NOC but missed some of its conditions?

This is the most common notice we see from units that think they are compliant. A NOC typically comes with conditions: tamper-proof digital water meters, often with telemetry, piezometers to monitor water levels, rainwater harvesting or recharge structures, water quality testing, and periodic compliance reports. Missing one of these is a breach even if your extraction stayed within the permitted quantity.

Answer condition by condition. For each, say whether it was met, when, and attach the proof: the meter invoice and installation photo, the telemetry login screenshot, the recharge pit photos with dates, the lab reports, the acknowledgement of each compliance report. Where the condition was met late, give the date it was completed. Where it is still pending, give the reason and a firm completion date.

If your extraction stayed within the NOC limit throughout, say so clearly and back it with meter data. That is the single most useful point in your favour, because it shows the breach was procedural and caused no extra drawdown. The authority still expects compliance, but the tone of the decision usually changes.

What to attach

Documents to attach to a groundwater notice reply

Permission papers

  • NOC with all conditions, and any renewal
  • Application acknowledgements and correspondence
  • Consent to operate showing water use declared to the board
  • Exemption basis, if you claim one, with daily use figures

Extraction records

  • Meter readings over the period in question
  • Meter calibration certificates
  • Telemetry data or login screenshots
  • Pump capacity and running hours, if no meter existed

Compliance proof

  • Recharge or rainwater harvesting structure photos and invoices
  • Piezometer installation and water level records
  • Water quality test reports
  • Filed compliance reports with acknowledgements

Other water sources

  • Municipal or industrial area water bills
  • Invoices for water bought from authorised suppliers
  • Treated wastewater reuse records
  • Proof of any period the bore was defunct or disconnected
Honest assessment

Common replies to a CGWA notice and how strong they are

What the unit saysHow strong it usually isWhat makes it work
We are an exempt userStrong if trueClear figures for daily use and the exact exemption relied on
Our NOC application was pendingModerateAcknowledgement of a complete application filed before the period alleged
We use municipal water, not the boreStrong if documentedWater bills that match your consumption, and a disconnected or sealed bore
Extraction was less than allegedModerate to strongMeter data; without a meter, credible running-hour records
The area category used is wrongStrong where dates support itThe assessment applicable to the period in question
We were never given a hearingGood legal pointProof that no notice was received or your reply was not considered
The previous owner drilled the boreWeak on its ownHelps only with the period, not with liability after you took over
Illustration

A cold storage whose NOC lapsed during renewal

Here's a made-up example. A cold storage on a highway holds a groundwater NOC that expires in March. The manager applies for renewal in May, two months late, because the consultant who handled the original NOC has left. In October, a show-cause notice arrives alleging extraction without a valid NOC since April, non-installation of telemetry, and failure to file two compliance reports. It proposes environmental compensation and sealing.

The reply answers the three points separately. On the lapse, it admits the late renewal, attaches the May application and shows from meter readings that extraction stayed well below the old permitted quantity. On telemetry, it attaches the purchase order placed in July and the installation photos from September. On the reports, it attaches the two reports, filed late, with acknowledgements, and asks for a personal hearing.

At the hearing, the officer accepts that the gap was administrative and the extraction within limits. The unit is not sealed. Compensation is worked out for the lapse period only, at a figure far lower than the notice suggested. The unit pays, its renewal is processed, and a staff member is now responsible for the compliance calendar. None of this needed a tribunal.

The hearing

What happens at the personal hearing?

Hearings before the groundwater authority or the district officer are short and informal. The officer has your reply and the inspection report and will usually ask a few direct questions: how much you extract, why a condition was missed, when it will be fixed. Send someone who knows the plant, not only a consultant or a lawyer. A works manager who can explain the meter and the recharge pits is often more persuasive than a legal argument.

Bring originals, and hand over any document that has come in since the reply. After the hearing, send a brief letter summarising what was said and anything you agreed to do, so there is a record if the final order differs.

When Advocate B.K. Singh prepares a unit for a groundwater hearing, the first thing he settles is the water balance: how much comes from the bore, from municipal supply and from recycled water, and where it goes. If those numbers are clear and consistent with the consent application, most of the hearing takes care of itself.

If sealing happens

Our borewell has been sealed. How do we get it de-sealed?

First, do not touch the seal. Breaking a seal or drilling a fresh bore after sealing is treated very seriously, and it destroys any chance of a quick revocation. Arrange temporary water from a lawful source, such as municipal supply or an authorised tanker supplier, and keep the invoices.

Then apply in writing for revocation of the sealing. The application should show that the reason for sealing has been dealt with: a NOC granted or applied for, meters and telemetry installed, recharge structures built, reports filed, any compensation demanded paid or deposited under protest. Authorities commonly revoke sealing on conditions, sometimes with an undertaking or a bank guarantee. Ask for an inspection to verify compliance, and follow up.

If the sealing order itself was wrong, for example because the unit was exempt or no hearing was given, revocation is not the only route. A direction under section 5 of the Environment (Protection) Act can be challenged before the NGT within 30 days. Many units do both: apply for revocation while preserving the appeal, so that a slow response does not leave them out of time.

The law

Legal provisions behind a groundwater notice

EP Act s.3(3) and s.5

The CGWA was constituted under section 3(3) of the Environment (Protection) Act 1986. Its directions to stop extraction, seal borewells or comply with conditions are generally issued under section 5. Rule 4 of the Environment (Protection) Rules 1986 normally requires the person to be given an opportunity to object before a direction is issued, except where the authority records that immediate action is needed.

Penalties after 2023

The Jan Vishwas (Amendment of Provisions) Act 2023 replaced many criminal offences under the EP Act with monetary penalties decided by an adjudicating officer. A notice may refer the matter for penalty in addition to compensation.

NGT Act s.16

An appeal lies to the NGT against directions issued under section 5 of the EP Act, within 30 days of the date the direction is communicated. The tribunal may allow up to a further 60 days if there was sufficient cause.

State groundwater laws

Where a state has its own groundwater law and authority, notices, permissions and appeals follow that law. Check the appeal provision in the state Act, because it may name a different first appeal forum.

Challenging the order

When should we appeal, and where?

Appeal when the final order is wrong on facts or law and the reply and hearing have not fixed it: you were exempt, the period or volume is plainly wrong, no hearing was given, or the authority had no jurisdiction. Do not appeal simply to buy time while doing nothing on the ground. The NGT expects to see compliance, and an appellant who is still extracting without permission gets little sympathy.

For a direction under section 5 of the EP Act, the appeal is to the NGT under section 16, within 30 days of communication. For an order under a state groundwater law, check that Act first. A writ petition to the High Court is possible where there is a pure question of jurisdiction or a breach of natural justice, but High Courts usually send matters that fall within the NGT Act to the tribunal. Our page on appeals against environmental orders explains the appeal process in more detail.

If the order includes environmental compensation, read our guide on compensation for illegal groundwater use, which covers how the figure is built and which parts are most often wrong.

Quick checks

Before you send the reply

  • Have you recorded the date the notice reached you and the reply deadline?
  • Does the reply answer every allegation, in the same order as the notice?
  • Have you asked for the inspection report if the notice relies on one?
  • Are your water use figures the same as those in your consent application?
  • Is there a dated document behind each statement of compliance?
  • Have you given firm dates for anything still pending?
  • Have you asked for a personal hearing?
  • Do you have proof of delivery, and a diary date for the 30-day appeal window if an order follows?
Common errors

Mistakes that make a groundwater notice worse

The worst mistake is silence. Units assume a notice from a central authority will go nowhere, and then find a sealing team at the gate. The second is replying with a generic letter drafted for a pollution board notice, which does not address meters, recharge or extraction volumes at all. The third is overclaiming: saying a meter was installed when it was only ordered, or that reports were filed when they were not. One false statement taints the rest of the reply.

Another frequent problem is dealing with the groundwater notice in isolation. The same gap often shows up in a pollution board inspection, a consent renewal or a buyer's due diligence. Fix the underlying permission properly. For businesses with wider consent or closure issues, see our pages on replying to pollution control board notices and obtaining a groundwater NOC.

Related guides

Where to go from here

If your unit is in a water-stressed block, read groundwater extraction rules in over-exploited areas before planning any expansion. If the notice came after neighbours complained about tankers or falling water levels, our guide on the water tanker mafia and illegal borewells shows the complaint from the other side, which helps you anticipate what the authority will look for.

FAQs

Frequently Asked Questions

How many days do I get to reply to a CGWA notice?

The notice states the time. If it is too short, write before it expires asking for a specific extension; do not simply let the date pass.

Can the CGWA seal my borewell without a hearing?

Normally an opportunity to object must be given before a direction is issued, except where the authority records that immediate action is needed. If you were sealed without any hearing, that is a point for revocation or appeal.

Do I need a lawyer to reply to a CGWA notice?

Not always. A simple notice about a missed report can be answered by the unit. Notices that threaten sealing or demand compensation are worth having checked before you reply.

Will applying for a NOC now stop the notice?

No. An application helps for the future, but the authority can still recover compensation for past extraction without permission. Reply to the notice separately.

What if the previous owner drilled the borewell?

That may help with the period before you took over, but liability for extraction after you took possession is yours. Get permission or stop extraction quickly.

Our meter was not working. Is that a violation?

Yes, if the NOC requires a working meter. Repair or replace it, keep the invoice and calibration certificate, and explain the gap with dates in your reply.

Can I keep using the borewell while I reply?

If you hold a valid NOC and there is no sealing direction, usually yes, within the permitted quantity. If you have no NOC, continuing extraction increases the compensation risk.

What happens if I break the seal on my borewell?

It is treated as a serious violation and makes revocation much harder. It can also lead to penalty proceedings and higher compensation.

Where do I appeal against a CGWA sealing order?

A direction under section 5 of the EP Act can be appealed to the NGT within 30 days of communication, with up to 60 more days for sufficient cause.

Does the state pollution board also care about my groundwater NOC?

Often yes. Consent orders frequently require a valid groundwater NOC, so a lapse can affect consent renewal as well.

Is a notice from the DM the same as a CGWA notice?

Not exactly. The DM may act under a state groundwater law or as an officer authorised by the groundwater authority. Check which power is cited and reply on that basis.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Received a groundwater notice or sealing order?

Send us the notice, your NOC or application and a note of your water sources on WhatsApp, or call us. We will tell you what the notice really alleges and what the reply needs to cover before the deadline.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.

Have a question about your own case?

A guide can only go so far. Send us the notice, the order or a few photos, and we'll tell you where you stand, which authority or NGT bench deals with it and when the next step is due, in plain words.

 +91-9315261599 Schedule Your Consultation