Staying Open Under GRAP and CAQM Rules in Delhi NCR

Running a factory, site or building in Delhi NCR? GRAP stages after the September 2026 revision, CAQM fuel and DG set rules.

Advice and representation before the pollution boards, environment authorities and the National Green Tribunal, for industries, builders, hospitals, RWAs and residents, led by Advocate BK Singh.

Get A Free Consultation

Last reviewed: October 2026

Every winter, businesses in Delhi NCR face the same uncertainty: when air quality worsens, the Graded Response Action Plan kicks in, and construction sites, factories, DG sets, vehicles and brick kilns may be restricted or shut at short notice. GRAP is administered by the Commission for Air Quality Management in National Capital Region and Adjoining Areas, set up under the CAQM Act, 2021, which also issues standing directions that apply all year, on industrial fuels, DG sets, construction dust, and more. Non-compliance leads to closure orders, environmental compensation, and prosecution or penalties under the CAQM Act.

On 28 September 2026, the Commission revised GRAP. The revised schedule has 48 actions across the four stages, with 25 at Stage I, 8 at Stage II, 10 at Stage III and 5 at Stage IV. Actions on DG sets were moved to Stage I, Sonipat was added to the districts where older BS-III petrol and BS-IV diesel light vehicles are restricted at the higher stages, and monitoring of construction sites through the dust portal was extended beyond municipal limits, with the 500 square metre threshold for registration unchanged. This page explains how GRAP works, the CAQM standing directions that matter most, how to plan for the season, and how to respond to closure orders.

Who sets the rulesCommission for Air Quality Management in NCR and Adjoining Areas, under the CAQM Act, 2021
GRAPFour stages linked to the AQI, revised on 28 September 2026 to 48 actions
Key changesDG set actions moved to Stage I
IndustryCoal and unapproved fuels banned

हिंदी में सारांश

दिल्ली NCR में वायु गुणवत्ता बिगड़ने पर ग्रेडेड रिस्पॉन्स एक्शन प्लान (GRAP) लागू होता है, जिसमें निर्माण, फैक्ट्री, DG सेट और वाहनों पर पाबंदियाँ लगती हैं। यह वायु गुणवत्ता प्रबंधन आयोग (CAQM) चलाता है। 28 सितंबर 2026 के संशोधन में 48 कार्रवाइयाँ हैं, DG सेट की पाबंदी अब स्टेज I से शुरू होती है, सोनीपत को वाहन पाबंदी में जोड़ा गया है और 500 वर्ग मीटर से बड़े निर्माण स्थलों की डस्ट पोर्टल निगरानी नगर सीमा के बाहर तक बढ़ाई गई है। उद्योग में कोयला और गैर-अनुमोदित ईंधन प्रतिबंधित हैं।

Check first

Is this your situation?

  • You run a factory in Delhi, Haryana, UP or Rajasthan NCR districts
  • You are building on a site of 500 square metres or more in NCR
  • Your housing society, mall or office uses DG sets
  • You received a CAQM or board closure order during GRAP
  • Your boiler or furnace uses a fuel you are not sure is approved
  • You run a brick kiln, hot mix plant or stone crusher in NCR
  • You want to plan operations for the coming winter
Key points

GRAP and CAQM at a glance

Stage I: Poor

AQI 201 to 300. Baseline measures across sectors, including DG set restrictions after the 2026 revision.

Stage II: Very Poor

AQI 301 to 400. Additional measures on dust, traffic, DG sets and parking.

Stage III: Severe

AQI 401 to 450. Ban on non-essential construction and demolition, curbs on older vehicles, industry restrictions.

Stage IV: Severe Plus

AQI above 450. Truck entry curbs, wider construction ban including some public projects, other emergency measures.

Standing directions

All-year CAQM directions on industrial fuels, DG sets, construction dust and waste burning.

Enforcement

Closure orders, environmental compensation and penalties under the CAQM Act.

Forecasts and orders

How GRAP is triggered

GRAP is not triggered automatically on a single day's reading. A sub-committee of the Commission reviews the air quality and the forecasts from the India Meteorological Department and the Indian Institute of Tropical Meteorology, and issues an order invoking a stage, usually in advance when deterioration is forecast. Actions of the earlier stages continue when a higher stage is invoked, so Stage III includes all Stage I and II actions. When air quality improves, the Commission revokes the higher stage, often keeping the lower stages in force.

Orders are published on the Commission's website and widely reported, and implementing agencies, including state pollution control boards, municipal bodies, development authorities, traffic police and district administrations, are responsible for enforcing them. For a business, the practical point is to follow the Commission's orders day by day during the season, rather than relying on news reports, because the exact list of permitted and prohibited activities is in the order.

The biggest impact

Construction under GRAP

Construction and demolition are the most affected activities. At Stage I and II, sites must follow dust control measures: screens, covering of materials, water sprinkling, anti-smog guns on larger sites, covered transport, and registration and self-monitoring on the dust portal for sites of 500 square metres or more. At Stage III, non-essential construction and demolition activities are banned across NCR, with exceptions for specified projects such as those of national importance, railways, metro, airports, hospitals, sanitation and certain linear public projects, subject to dust norms. At Stage IV, the ban widens to cover linear public projects such as highways, roads, flyovers, power lines and pipelines.

Even during a ban, some activities such as plumbing, interior work, electrical work and carpentry that do not create dust may be permitted. Builders should read the order closely. Sites found working in breach face closure, environmental compensation and seizure of equipment. Under the September 2026 revision, the Commission extended dust portal monitoring to sites beyond municipal limits, closing a gap that allowed peri-urban sites to escape scrutiny. See construction dust compliance.

The standing rules

Industry, fuels and closure

For industry, the most important CAQM rules apply all year, not only under GRAP. The Commission has banned coal and other unapproved fuels for industrial, domestic and miscellaneous uses across NCR, subject to limited exceptions, and published a list of approved fuels. Industries in areas with piped natural gas have been required to switch to gas. Units running on unapproved fuels are routinely closed during inspection drives regardless of their consent.

Under GRAP, additional restrictions apply at higher stages, including closure of industries in certain sectors that are not running on approved fuels and restrictions on specified activities such as brick kilns, hot mix plants and stone crushers. Units with valid consent and approved fuels are usually allowed to continue, but must be ready to show compliance quickly when inspection teams arrive. Keep fuel invoices, consent copies, monitoring reports and online monitoring data accessible at the gate.

Earlier restrictions

DG sets after the 2026 revision

Diesel generator sets have long been restricted in NCR under CAQM directions, which require larger gensets to be converted to dual fuel or fitted with approved emission control devices, and limit their use to emergencies and essential services. The September 2026 revision of GRAP moved the DG set actions to Stage I, so these restrictions now apply from the earliest stage of the winter season, not only when air quality turns very poor. Housing societies, malls, offices, hospitals and factories should therefore have compliant backup power arrangements in place before the season begins. See DG set emission norms.

Step by step

How to prepare for the season

1

Review your exposure

List construction sites, gensets, boilers, furnaces and vehicles affected by CAQM directions and GRAP.

2

Fix the standing compliance

Approved fuels, DG set upgrades, dust portal registration and consent.

3

Plan for each stage

Decide what continues, what stops and what needs prior permission at each GRAP stage.

4

Prepare documents

Keep consent, fuel invoices, genset certificates and portal records ready for inspection.

5

Track the Commission's orders

Assign someone to read each order and confirm what it means for your sites.

6

Respond quickly to notices

Reply with evidence and seek revocation of closure orders where justified.

What to do

If you receive a closure order

Closure orders during GRAP are often issued on the spot by inspection teams or through directions of the board or the Commission. They usually take effect immediately. The first step is to comply with the order while preparing a response, because continuing in breach makes the position much worse. Then gather evidence: the consent, the fuel records, the dust control measures, photographs taken that day, and portal data. If the closure was based on a mistake, for example treating an exempt activity as prohibited, or a unit on approved fuel as using coal, apply promptly to the authority that issued the order for revocation, with the evidence.

Where the authority does not act, or the order is clearly beyond the direction, legal remedies are available, including before the High Court. In many cases, a prompt, well-documented application leads to revocation within days. Environmental compensation demands that follow closure should be checked against the rates and the period of violation. See closure notice reply.

What to expect

Time and typical cost

Our fees are agreed in writing at the start, stage by stage. They are not linked to the outcome.

StageUsual timeWhat it involves
Pre-season compliance review1 to 2 weeksOur fee
DG set and fuel upgradesWeeks to monthsEquipment and conversion cost
Dust portal registrationDaysInternal effort
Response to a closure orderImmediately; within daysOur fee
Environmental compensation disputeWeeksOur fee
Quick reference

GRAP stages and common business impacts

StageAQICommon impacts
Stage I201 to 300Dust control, DG set restrictions, waste burning bans
Stage II301 to 400Stricter dust and DG set measures, parking fees, traffic measures
Stage III401 to 450Non-essential C&D banned, older vehicles curbed, industry restrictions
Stage IVAbove 450Truck entry curbs, wider C&D ban, emergency measures
Paperwork

Documents usually needed

Unit or site

  • Consent to establish or operate
  • Dust portal registration for construction sites

Fuel and equipment

  • Fuel purchase invoices
  • DG set conversion or retrofit certificates
  • Boiler and furnace details

Enforcement

  • Closure order or notice
  • Photographs and monitoring data
Legal basis

Laws that apply

Commission for Air Quality Management in NCR and Adjoining Areas Act, 2021

Powers of the Commission, directions and penalties.

Graded Response Action Plan (revised 28 September 2026)

Stage-wise actions linked to the AQI.

CAQM directions on fuels, DG sets and dust

Standing rules applying all year.

Air (Prevention and Control of Pollution) Act, 1981

Consent and pollution control by state boards.

Our approach

How we work

We are a litigation and advisory practice led by Advocate BK Singh, with offices in Dwarka (New Delhi) and Vaishali (Ghaziabad). This is what you can expect:

  • Pre-season planning: so you know what continues at each stage.
  • Standing compliance fixed: fuels, DG sets and dust.
  • Fast response to closures: with evidence and revocation applications.
  • Compensation demands checked: rates and period.
  • Written fee terms: agreed stage by stage, never linked to the outcome.
Avoid these

Mistakes we see under GRAP

  • Relying on news reports instead of the Commission's order
  • Continuing work after a closure order while preparing a reply
  • Assuming DG set restrictions start only at Stage II
  • Using unapproved fuel because the consent mentions it
  • Not registering a peri-urban site on the dust portal
Illustration

A builder in Ghaziabad during Stage III

Here's a made-up example. A Ghaziabad builder's site was sealed during Stage III for carrying out excavation. The builder argued that only interior work was being done.

Photographs from the inspection showed excavation in progress, which was prohibited. We advised the builder to accept the closure for the period, stop all dust-generating work, and apply for revocation once the stage was lifted, with the dust portal records and an undertaking. The site reopened when Stage III was revoked, and the compensation was limited to the days of violation.

Illustration

A factory wrongly treated as on coal

Here's a second made-up example. A Faridabad forging unit was closed during an inspection drive on the basis that it was using coal. The unit had switched to piped gas a year earlier, and a coal heap at the site belonged to an old stock awaiting disposal.

We applied to the board the next day with gas bills, the boiler conversion certificate and photographs showing the coal heap was not connected to any furnace. The closure was revoked within a week, and the unit disposed of the old coal stock with records.

FAQs

Frequently Asked Questions

What is GRAP?

The Graded Response Action Plan for Delhi NCR, with actions in four stages linked to the AQI.

Who issues GRAP orders?

The Commission for Air Quality Management in NCR and Adjoining Areas.

What changed in September 2026?

48 actions in total, DG set actions moved to Stage I, Sonipat added to vehicle curbs, and wider dust portal monitoring.

Is construction banned under GRAP?

Non-essential construction and demolition are banned at Stage III, with a wider ban at Stage IV.

Which sites must register on the dust portal?

Sites of 500 square metres or more in NCR.

Can I use coal in my factory in NCR?

No, coal and unapproved fuels are banned for industry, with limited exceptions.

Do DG set rules apply all year?

CAQM directions apply all year, with stricter GRAP actions from Stage I.

What if my site is closed by mistake?

Comply, gather evidence, and apply promptly for revocation.

Can I challenge a closure order?

Yes, through revocation applications and legal remedies where needed.

Do GRAP rules apply outside Delhi?

Yes, across the NCR districts of Haryana, UP and Rajasthan as well as Delhi.

Are interior works allowed during a ban?

Non-dust-generating works may be allowed; read the order closely.

What penalties apply?

Closure, environmental compensation, and penalties under the CAQM Act.

Planning for the GRAP Season?

Send us your site and unit details. We will check your exposure and set out a plan.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Environmental rules, EPR targets, GRAP measures and board procedures change often, so check the current position for your unit or project before acting.