Dealing With the Maharashtra Pollution Control Board (MPCB)

Dealing with the Maharashtra Pollution Control Board (MPCB): consents, renewals, inspections, closure notices, NGT Pune appeals and resident complaints.

Advice and representation before the pollution boards, environment authorities and the National Green Tribunal, for industries, builders, hospitals, RWAs and residents, led by Advocate BK Singh.

Get A Free Consultation

Last reviewed: October 2026

The Maharashtra Pollution Control Board (MPCB) is the state regulator under the Water Act, 1974, the Air Act, 1981 and the waste rules made under the Environment (Protection) Act, 1986. It grants consent to establish and consent to operate, authorises hazardous and bio-medical waste handling, inspects units, takes samples, issues show-cause notices and closure directions, and levies environmental compensation. For units, almost every compliance problem passes through its regional offices. For residents, it is the first authority to approach, and the one the NGT will ask to act.

Short answer: MPCB grants and renews consents (CTE and CTO), issues waste authorisations, inspects and samples units, and can order closure or disconnection. Units challenge consent refusals before the state appellate authority and closure directions before the NGT Western Zone Bench at Pune within 30 days. Residents should complain in writing to the regional office with evidence, and go to the NGT if nothing happens.

This page is for units in Maharashtra dealing with MPCB over consents and notices, and for residents who want MPCB to act. It explains what the board can do, how its notices escalate, and where its orders can be challenged.

For the consent basics, start with our pages on consent to operate and the difference between CTE and CTO. For the wider picture of environmental cases in the state, see environmental lawyer for Maharashtra.

Laws enforcedWater Act, Air Act, EP Act rules
Main permissionsCTE, CTO, waste authorisations
Consent appealState appellate authority, 30 days
Closure direction appealNGT, 30 days
NGT benchWestern Zone Bench, Pune
High CourtBombay High Court and its benches

हिंदी में सारांश

महाराष्ट्र प्रदूषण नियंत्रण बोर्ड (MPCB) जल अधिनियम, वायु अधिनियम और पर्यावरण संरक्षण अधिनियम के अपशिष्ट नियमों को लागू करता है। कोई भी उद्योग, होटल, अस्पताल या बड़ा निर्माण प्रोजेक्ट स्थापना की सहमति (CTE) और संचालन की सहमति (CTO) के बिना नहीं चल सकता। बोर्ड निरीक्षण करता है, नमूने लेता है, कारण बताओ नोटिस देता है और बंद करने या बिजली-पानी काटने का निर्देश दे सकता है। सहमति से इनकार के खिलाफ अपील राज्य अपीलीय प्राधिकरण में 30 दिन में होती है, और बंदी के निर्देश के खिलाफ अपील NGT पश्चिमी पीठ, पुणे में 30 दिन में। प्रदूषण से परेशान नागरिक क्षेत्रीय कार्यालय में सबूत के साथ लिखित शिकायत करें। कार्रवाई न हो तो NGT जाया जा सकता है।

In short

The essentials

Consent before anything

No unit or covered project may be built or run in Maharashtra without CTE and then CTO from MPCB.

Renew before expiry

Running on an expired consent, even with a late renewal pending, can be treated as running without consent.

Samples decide cases

Most MPCB action starts with an inspection report and a failed sample, so both deserve close reading.

Notices escalate in stages

A show-cause notice or proposed directions usually come before interim or closure directions.

Two appeal routes

Consent refusals go to the state appellate authority; closure and other directions go to the NGT at Pune.

Residents can push

A written, evidenced complaint to the regional office creates a record the NGT will look at later.

Most asked

What does the Maharashtra Pollution Control Board actually control?

MPCB controls who may discharge effluent, emit smoke or handle certain wastes in Maharashtra, and on what conditions. Its core powers come from two Acts: the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981. Under both, an industry, operation or process that discharges sewage or trade effluent, or emits air pollutants, needs the board's consent before it is set up and again before it starts running.

On top of that, the state board grants authorisations under several rules made under the Environment (Protection) Act, 1986: the Hazardous Waste Rules 2016, the Bio-Medical Waste Management Rules 2016 and parts of the plastic and solid waste rules. When the NGT wants a site in Maharashtra inspected, MPCB is usually on the joint committee.

What MPCB does not do matters just as much. Land use, building permissions and tree felling belong to the municipal corporation, the planning authority and the tree authority. And the board is not a court: it cannot award compensation to a neighbour whose crop or health has suffered. That claim goes to the NGT under section 15 of the NGT Act.

Consents

Does my unit or project need MPCB consent?

Almost certainly yes, unless it falls in the white category. CPCB classifies industries as red, orange, green or white by their pollution potential, and states follow that list with some variations. White category units are exempt from consent. Every other unit needs consent to establish (CTE) before it builds or installs machinery, and consent to operate (CTO) before it starts production. Large building and township projects, hotels, hospitals, STPs and many service activities also fall within the consent net.

Like most boards, MPCB looks at both the colour category and the size of the unit, usually judged by capital investment, when it decides how an application is processed, how long the consent will last and how often the unit will be inspected. Applications go through the board's online consent system and are examined by the regional or sub-regional office.

Be careful with assumptions. Amendments and notifications in 2024 and 2025 have changed some consent requirements, including exemptions, so a unit told years ago that it needed no consent should check again. So should a unit that was green when it started and has since added a process that pushes it into orange or red.

At a glance

MPCB permissions and what triggers each

PermissionWho needs itLawPractical point
Consent to establish (CTE)New units and covered projects, before constructionWater Act s.25, Air Act s.21Site and pollution control design are examined; mistakes are cheapest to fix here
Consent to operate (CTO)Units before production, and on every renewalWater Act s.25, Air Act s.21Sets discharge and stack limits, monitoring and reporting
Consent for expansionUnits adding capacity, products or processesSame sectionsExpanding on an old consent is a common reason for closure
Hazardous waste authorisationUnits generating, storing or recycling hazardous wasteHazardous Waste Rules 2016Storage limits, manifests and annual returns are checked
Bio-medical waste authorisationHospitals, clinics, labs and other healthcare facilitiesBio-Medical Waste Rules 2016Small clinics and pathology labs need it too
Renewals and changes

Renewal, expansion, new products and change of ownership

The most common MPCB trouble we see is not a dramatic pollution incident. It is paperwork that drifted out of line with reality. A unit renews its CTO on the old capacity after quietly adding two reactors. A hotel adds a banquet wing and a second DG set. On inspection, the officer compares the consent order with what is on the ground, and every difference becomes a violation.

If you plan to add capacity, products or a new process, apply for consent for expansion before you build, and check whether the change also needs an environmental clearance or an amendment to one. If you buy a running unit, get the consent transferred in the new owner's name and make sure past violations are disclosed in the sale documents. Our page on consent for expansion of an existing unit covers this in more detail. And file renewals well before expiry, keeping proof of the filing date and every query answered.

Inspections

What happens when MPCB officers inspect your unit?

Officers walk through the plant, look at the ETP or STP, the air pollution control equipment and the hazardous waste store, and ask for the consent order, logbooks, meter readings, manifests and returns. They may sample effluent, stack emissions or ambient air. The visit ends with an inspection report, signed on the spot or sent later.

Read the report the day you get it. Reports sometimes record what an officer was told in passing, or describe a bypass line that was in fact blanked off. If something is wrong, write to the regional office within days, with photographs, so the correction is on record before any notice. Silence is usually read as agreement.

Samples matter even more. The Acts lay down a procedure for samples meant for legal proceedings, including notice to the occupier and sealing of sample parts, so ask for a copy of the sampling memo. A sample taken during start-up after a power cut tells a different story from one taken in normal running, and that context belongs in your reply.

Notices

MPCB has sent a show-cause notice or proposed directions. What now?

Treat it as the board's draft decision. MPCB action usually comes in stages. A show-cause notice or proposed directions set out the violations and the action intended. If the reply does not satisfy it, the board may issue interim directions, often requiring a bank guarantee and a time-bound plan. Closure, or directions to stop electricity and water supply, generally follows where those steps fail or the violation is serious.

A good reply answers each allegation separately, admits what is true, shows what has been fixed with proof (purchase orders, photographs, fresh laboratory reports) and asks for a hearing. It does not deny what the sample report plainly shows. Since the Jan Vishwas Act 2023 and the Water Amendment Act 2024, many violations also carry monetary penalties fixed by an adjudicating officer, so the reply may be read in that proceeding too.

When Advocate B.K. Singh reviews a notice from a state board, the first thing he checks is what exactly the board has proposed and under which section, because that decides the remedy. A direction under section 33A of the Water Act or section 31A of the Air Act is appealable to the NGT, whereas a refusal of consent goes first to the appellate authority. Getting the forum wrong wastes a short limitation period. Our page on replying to a closure notice goes through the drafting in more depth.

Step by step

How to respond to an MPCB notice or closure direction

These steps assume a unit has received a notice or direction. The time limits are short, so start the same day.

1

Note the dates

Record when the notice or order was received. The 30-day appeal period runs from communication, so keep the envelope or email.

2

Read what is alleged

List each violation and the section relied on. Separate paperwork issues (expired consent, missing returns) from pollution issues (failed sample, bypass).

3

Get the record

Ask the regional office for the inspection report, sampling memo and analysis report, or file an RTI application, which must be answered within 30 days.

4

Fix what can be fixed

Repair the ETP, install the missing meter, file the overdue return. Photograph and date everything.

5

Reply in writing

Answer point by point, attach evidence, give a time-bound plan for what is pending, and request a hearing.

6

Appeal if needed

If closure or disconnection is ordered, decide quickly whether to appeal to the NGT Western Zone Bench at Pune, or comply and seek revocation. Both can run side by side.

7

Apply for revocation

Once compliant, apply to MPCB to revoke the direction. Expect conditions, a bank guarantee or a fresh inspection before supply is restored.

Revocation is what most units actually need, and it is usually faster through the board. An appeal makes sense where the direction is plainly wrong, out of proportion, or passed without a hearing.

Appeals

Which MPCB order goes where

Order or problemFirst forumTime limitNext step
Consent refused, or harsh conditions imposedState appellate authority (Water Act s.28, Air Act s.31)30 daysNGT Western Zone Bench under s.16
Closure, prohibition or disconnection directionNGT Western Zone Bench (Water Act s.33B, Air Act s.31B)30 days, plus up to 60 days for sufficient causeSupreme Court on a question of law, 90 days
Direction under EP Act s.5NGT under s.1630 days, plus up to 60 daysSupreme Court, 90 days
Environmental compensation demandRepresentation to the board, then the NGT or High Court depending on the orderAct quickly; read the orderDepends on the forum
Board not acting on pollutionNGT original application under s.146 months from cause of action, plus up to 60 daysSupreme Court, 90 days
Damage to health, crops or propertyNGT under s.155 years, plus up to 60 daysSupreme Court, 90 days

For the first step in consent disputes, see our page on appeals before the state appellate authority. For money demands, see challenging an environmental compensation demand.

Courts

Which NGT bench and High Court hear Maharashtra cases?

Maharashtra falls under the NGT Western Zone Bench at Pune, which also covers Gujarat and Goa. Appeals against MPCB closure directions, challenges to environmental clearances for projects in the state, and residents' applications about pollution in Maharashtra are normally filed there. Hearings can be attended by video conference, so a unit in Nagpur need not travel to Pune for every date.

The Bombay High Court, sitting at Mumbai and at its benches in Nagpur and Aurangabad, keeps its writ jurisdiction. It is the right forum where the problem is really about a fundamental right, a mala fide action or a question outside the seven Acts the NGT covers, and it has passed long-running directions on protecting mangroves around Mumbai. But where the dispute is squarely about pollution under the Water Act, Air Act or EP Act, the High Court will usually send the parties to the NGT.

Across the state

Maharashtra's industrial belts and the problems each one brings

MPCB regulates a very uneven state. The chemical and pharmaceutical belts along the coast, at Tarapur in Palghar, Taloja, Mahad and Roha in Raigad, and Lote Parshuram in Ratnagiri, produce most of the effluent, odour and hazardous waste complaints, and many units there depend on common effluent treatment plants. Tarapur has been listed among critically polluted areas in CPCB's CEPI assessments. For local detail, see our pages on environmental cases in Palghar-Tarapur and environmental cases in Raigad.

The Pune, Chakan and Pimpri-Chinchwad belt and the Waluj and Shendra estates around Chhatrapati Sambhajinagar are dominated by engineering and automobile units, where paint shops, foundries, DG sets and hazardous waste storage draw most of the attention. Western Maharashtra's sugar factories and distilleries raise seasonal spentwash issues, and the coal mines and thermal power plants around Chandrapur bring fly ash and dust.

Mumbai, Thane and Navi Mumbai bring urban problems: ready-mix concrete plants, construction dust, society sewage and debris dumped on mangroves. Here MPCB shares the field with the municipal corporations, the coastal zone authority and the police, and complaints stall when each points at another.

For residents

How to complain to MPCB so that it actually acts

Complain in writing to the MPCB regional or sub-regional office that covers your area, and keep proof of delivery. Name the unit and its exact location, describe what you see, smell or hear, give dates and times, and attach photographs and short videos with the date visible. Ask for specific things: an inspection, sampling of the effluent or ambient air, a check of the unit's consent, and a copy of the inspection report. A vague complaint about pollution in our area tends to be filed away.

If the unit is in an MIDC estate, copy the MIDC regional office. If the problem is sewage or garbage, the municipal corporation or council is the main authority and MPCB a secondary one. For noise at night, the police come first. For mangrove cutting or filling of a creek, write to the coastal zone authority and the collector as well, and read our page on CRZ violations and mangrove destruction.

Give the board four to eight weeks, then file an RTI application asking what action was taken, with copies of the inspection and sample reports. If nothing happened, you now have the record for an NGT application. Advocate B.K. Singh's usual advice to residents' groups is to write the complaint as if a judge will read it later, because often one does.

Keep ready

Documents that decide most MPCB matters

For units

  • Current CTE and CTO orders with all conditions
  • Renewal applications, fee receipts and board queries
  • Environmental clearance and compliance reports, if applicable
  • Hazardous waste authorisation, manifests and annual returns
  • ETP or STP logbooks, flow meter and energy meter readings
  • Reports from a recognised laboratory
  • Every inspection report, notice and reply, in date order

For residents

  • Copies of written complaints with proof of delivery
  • Dated photographs and videos
  • Medical records or crop loss records, where relevant
  • RTI replies with inspection and sample reports
  • Names and contacts of others affected
Our work

What we do in MPCB matters

  • Consent review. We check whether the unit's consent matches its actual capacity, products and processes, and fix the gaps before an inspection finds them.
  • Replies to notices. We draft point-by-point replies to show-cause notices and proposed directions, and appear at hearings before the board.
  • Revocation of closure. We prepare the compliance file and the application for revoking closure or disconnection, and follow it through to restoration of supply.
  • Appeals. We file appeals before the state appellate authority against consent refusals and conditions, and before the NGT Western Zone Bench against directions.
  • Environmental compensation. We examine how the amount was worked out, the days counted and the factors applied, and challenge errors in the right forum.
  • Residents' complaints. We help residents, societies and village groups frame complaints, use RTI, and take the matter to the NGT when the board does not act.
What goes wrong

Common mistakes in dealing with MPCB

Units most often go wrong by treating the consent as a one-time licence. They file renewals late, expand without consent, let the ETP become a showpiece that runs only on inspection days, or forget hazardous waste returns. Each of these is easy to prove from the board's own file. The second big mistake is replying to a notice with a general letter promising compliance, with no dates and no evidence.

Residents go wrong differently. They complain once, by phone or on social media, and wait. They file in the NGT before giving the board a written chance, and the tribunal simply directs the board to look into it. Or they wait years and run into the six-month limit.

Illustration

A chemical unit, a failed sample and proposed directions

Here's a made-up example. A small specialty chemicals unit in an MIDC estate near Navi Mumbai receives proposed directions from MPCB. The inspection report says the effluent failed the COD limit, a flexible pipe was found running from the ETP collection tank towards a stormwater drain, and the hazardous waste storage area held more than the authorised quantity. The owner's first instinct is to send a one-page reply saying the pipe was for cleaning and the sample was wrong.

Instead, the reply admits the storage problem and attaches a manifest showing the excess went to the common TSDF two days after the inspection. It explains, with the plant logbook and the electricity bill, that the sample was taken an hour after restart following a power failure, and attaches a fresh report from a recognised laboratory. The flexible pipe is removed, the drain outlet is sealed, and photographs are enclosed. The reply asks for a hearing and offers a bank guarantee.

The board issues interim directions with a bank guarantee and monthly reporting, but does not close the unit. Had it ordered closure, the same compliance file would have been the core of an appeal to the NGT at Pune.

Read next

When to bring in a lawyer, and related pages

Not every MPCB letter needs a lawyer; a renewal query can be handled by the unit's consultant. Bring in legal help when the board proposes directions, orders closure, demands compensation or refuses consent, or when someone has filed a case against the unit. For residents, it is worth it once the board has had a fair chance and done nothing.

Units in other states deal with boards that have their own habits. See our pages on dealing with the Gujarat Pollution Control Board, the Karnataka State Pollution Control Board and the Tamil Nadu Pollution Control Board. For notices in general, read how to reply to a pollution board closure notice.

FAQs

Frequently Asked Questions

Is MPCB consent required for a small unit?

Yes, unless the unit falls in the white category, which is exempt. Recent amendments have changed some exemptions, so check the current list for your activity before assuming you are outside it.

What is the difference between MPCB CTE and CTO?

Consent to establish is needed before you build or install plant. Consent to operate is needed before production starts and must be renewed before it expires.

Can I keep running if my CTO renewal is pending?

It is risky. If the renewal was filed late or incomplete, the board can treat the unit as operating without consent, so file early and keep proof of the filing date and every query answered.

Can MPCB cut electricity and water to my factory?

Yes. Under section 33A of the Water Act and section 31A of the Air Act, the board can direct closure and stoppage of electricity, water or other services, usually after a show-cause notice.

Where do I appeal against an MPCB closure direction?

To the NGT Western Zone Bench at Pune, within 30 days of the direction being communicated. The tribunal can allow up to 60 more days if there was sufficient cause.

Where do I appeal if MPCB refuses consent?

First to the state appellate authority under section 28 of the Water Act or section 31 of the Air Act, within 30 days. Its order can then be challenged in the NGT.

How do I complain to MPCB about a polluting factory?

Write to the regional or sub-regional office covering the area with the unit's name and location, dated photos and videos, and a request for inspection and sampling. Keep proof of delivery and follow up with an RTI application after a few weeks.

MPCB is not acting on my complaint. What can I do?

After a reasonable time, you can file an original application in the NGT at Pune, using your complaint and RTI replies as evidence. The NGT usually asks the board, often through a joint committee, to inspect and report.

Can MPCB impose environmental compensation?

Yes. Boards use a formula-based CPCB method that looks at the industry category, days of violation, size and location of the unit, and the working can be checked and challenged if it is wrong.

Can I go to the Bombay High Court instead of the NGT?

The High Court's writ jurisdiction remains, but for disputes under the Water Act, Air Act or EP Act it usually sends parties to the NGT. A writ suits issues outside the NGT's seven Acts or questions of fundamental rights.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Have an MPCB notice, order or complaint?

Send us the notice, the consent order or a short description of the pollution problem on WhatsApp or by phone. We will tell you the time limit, the right forum and what to do first.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.

Need help with Dealing With the Maharashtra Pollution Control Board (MPCB)?