The Rajasthan State Pollution Control Board (RSPCB) gives consent to factories, mines, crushers and processing units, inspects them, and acts against pollution through notices, closure and disconnection. If you hold or need its consent, you must apply before you build or run, renew on time, and answer every notice with proof. If the board refuses consent, appeal to the state appellate authority within 30 days; if it orders closure, appeal to the NGT Central Zone Bench at Bhopal within 30 days.

Short answer: Get RSPCB consent before setting up or running a unit, mine or crusher, and renew it before expiry. A refusal of consent goes to the state appellate authority within 30 days. A closure or disconnection direction is appealed to the NGT Central Zone Bench, Bhopal, within 30 days. Residents complain to RSPCB first and can then approach the NGT.

Rajasthan's pollution problems are shaped by its geography: mining and stone everywhere, textile dyeing in the dry west, industrial estates near Delhi, and very little water. This page explains how RSPCB deals with each, how consent works for mines, crushers and processing units as well as factories, what to do with a notice, and how residents can make the board act. For other environmental matters in the state, see our page for an environmental lawyer in Rajasthan.

Rajasthan's NGT cases go to the Central Zone Bench at Bhopal, and writs go to the Rajasthan High Court, which sits at Jodhpur with a bench at Jaipur.

BoardRajasthan State Pollution Control Board
NGT benchCentral Zone, Bhopal
High CourtRajasthan High Court, Jodhpur and Jaipur Bench
Closure appealNGT, within 30 days

हिंदी में सारांश

राजस्थान राज्य प्रदूषण नियंत्रण बोर्ड (RSPCB) कारखानों, खदानों, स्टोन क्रशर और प्रोसेसिंग इकाइयों को स्थापना और संचालन की सहमति देता है, निरीक्षण करता है और नोटिस, बंदी या बिजली कटौती के आदेश देता है। इकाई लगाने और चलाने से पहले सहमति लें और समय पर नवीनीकरण कराएँ। सहमति अस्वीकार होने पर 30 दिन में राज्य अपीलीय प्राधिकरण में अपील करें। बंदी के आदेश के खिलाफ 30 दिन में एनजीटी केंद्रीय पीठ, भोपाल में अपील करें। निवासी पहले बोर्ड में लिखित शिकायत करें।

In short

The essentials

Bhopal hears Rajasthan

The NGT Central Zone Bench at Bhopal covers Rajasthan, and hearings by video conference are common.

Mines and crushers need consent

Mining leases, stone crushers and marble processing units need RSPCB consent, along with their other permissions.

Water is scarce

Textile and other effluent in the west is closely watched, and CETP or ZLD conditions are common in clusters.

Amended Water Act applies

The 2024 amendment to the Water Act applies in Rajasthan, changing how many water offences are penalised.

Aravallis and wildlife areas

Mining and construction near the Aravallis, sanctuaries and eco-sensitive zones raise issues beyond pollution.

Thirty days, then sixty

Appeals run 30 days from communication, with up to 60 more days only if you can show sufficient cause.

The main question

Does my mine, crusher or marble unit need RSPCB consent, and what if I started without it?

Almost certainly yes. Mining of major and minor minerals, stone crushing, and marble, granite and sandstone processing all discharge or emit, so they need consent to establish before setting up and consent to operate before running, under section 25 of the Water Act and section 21 of the Air Act. A mining lease and an environmental clearance do not replace the board's consent; each is a separate permission, and a mine on forest land needs forest clearance as well.

If you started without consent, the position is serious but not hopeless. Running without consent is a violation that can lead to closure and environmental compensation. The usual practical route is to stop the activity, apply for consent with full and honest details, and deal with the compensation for the period already run. Trying to hide the past operation rarely works: satellite imagery, royalty records, electricity bills and transport permits all show when a mine or crusher was working.

Siting is the other early question. Stone crushers and hot mix plants must meet the state's siting norms, which set distances from habitation, schools, hospitals, highways and rivers. Those distances are set and revised by the state, so check the current norms for your location before buying land or machinery. A crusher on the wrong site may never get consent, however good its dust controls.

Powers

What RSPCB does

RSPCB is the State Board under the Water Act 1974 and the Air Act 1981. It grants and refuses consent, sets conditions on effluent, emissions and dust, inspects, samples, and gives directions including closure and stopping of power or water. Under rules made under the EP Act it grants authorisations for hazardous waste and bio-medical waste and enforces the plastic, e-waste and battery waste rules within the state.

Industries are classed red, orange, green or white under the CPCB categorisation; white category units are exempt from consent. Notifications in 2024 and 2025 have changed some consent requirements and exemptions, so a unit should check the current position for its category.

Rajasthan was one of the states whose resolutions led Parliament to pass the Water (Prevention and Control of Pollution) Amendment Act 2024, so the amended Act applies here. It replaces many criminal offences with monetary penalties decided by an adjudicating officer, and allows the Central Government to exempt some categories of industry from consent and to issue guidelines on consent. Air Act and EP Act offences were changed in a similar way by the Jan Vishwas Act 2023. Penalty orders can themselves be challenged, and the limits are short.

Industry

Rajasthan's industrial and mining areas and what RSPCB watches

A general guide. The exact obligations of any unit are in its own consent order.

Area or sectorTypical activityMain board concerns
Pali, Balotra, Jodhpur and other western textile clustersDyeing and printing of clothEffluent into the Bandi, Luni and Jojari rivers, CETP performance, ZLD conditions
Sanganer and Bagru near JaipurHand-block and screen printing, dyeingEffluent from small units, CETP connection, units in residential areas
Bhiwadi and NeemranaEngineering, chemical, food and other industries near DelhiAir emissions, effluent, groundwater, hazardous waste
Rajsamand, Udaipur, Kishangarh and MakranaMarble and granite cutting and processingSlurry disposal, dust, waste on village land and drains
Districts across the stateStone crushers, masonry stone and sandstone miningDust, siting, blasting, consent and lease conditions
Kota and Chittorgarh beltsThermal power, chemicals, cementFly ash, stack emissions, effluent into the Chambal and other rivers
Step by step

Getting and keeping RSPCB consent for a mine, crusher or processing unit

1

Check siting and category

Confirm the site meets the state's current siting norms for your activity and identify the category. Do this before buying land or machinery.

2

Line up the other permissions

Lease or quarry permit, environmental clearance where required, forest clearance if forest land is involved, and groundwater permission if you will draw water.

3

Apply for consent to establish

Apply through the board's online consent system with the site plan, process description, pollution control measures and land documents. Make sure figures match across documents.

4

Install the controls

Dust suppression, enclosures, wind-breaking walls, water sprinklers, slurry pits or settling tanks, as the consent requires. Photograph them.

5

Apply for consent to operate

Apply before production, showing that the controls are installed and working. Do not start trial runs without permission.

6

Keep the records

Maintain sprinkling logs, production and dispatch records, monitoring reports and waste disposal receipts. Inspectors ask for these first.

7

Renew early and report changes

Apply for renewal well before expiry. Any change in capacity, machinery or process needs fresh or amended consent before it runs.

For the general process for factories, see our page on consent to operate.

Marble and slurry

Marble slurry: the problem RSPCB keeps coming back to

Cutting and polishing marble and granite produces large quantities of wet slurry, fine stone powder mixed with water. Dumped on open land or along drains, it dries into dust that blows over fields and settles in water bodies, and it smothers soil. In the main marble areas, units are generally required to send slurry only to designated dumping yards or for approved reuse, and RSPCB's consent conditions for processing units deal with it directly.

For a unit, the risk is the transporter. A unit pays a truck operator to take slurry to the yard; the truck dumps it on a village common or a seasonal nala instead. When villagers complain, the board traces the slurry back to the units using that transporter. Keep weighbridge slips and dumping yard receipts for every load, and do not use transporters who cannot produce them.

For villagers, the evidence that works is photographs of the trucks and their registration numbers, the location of the dumping, and the damage to the land or water. Complain to the board and the district administration together. Our page on stone crusher and quarry pollution covers dust-related complaints more generally.

Textile clusters

Textile dyeing in Pali, Balotra and Jodhpur

The western textile clusters discharge into seasonal rivers that are dry for most of the year, so untreated effluent does not dilute; it soaks into fields and groundwater. These rivers have been before the courts and the NGT for years. RSPCB's approach to the clusters centres on CETPs and, in many cases, on zero liquid discharge conditions. Our guide on zero liquid discharge rules explains how ZLD conditions work.

A dyeing unit should know exactly what its consent says about where effluent goes, whether it is a CETP member in good standing, and whether its discharge figures match its water use. Units outside designated areas, running without consent in residential or agricultural land, are the ones most often sealed after complaints. A unit that has outgrown its CETP allocation is also at risk, even if its own treatment is good.

Notices

Show-cause notices, closure and disconnection from RSPCB

A notice under section 33A of the Water Act or section 31A of the Air Act signals possible closure or disconnection. Record the date it was received. Reply within the time given, allegation by allegation, attaching consents, records, photographs and fresh lab reports. Ask for the inspection report and sample results if they were not given, and ask for a personal hearing.

If closure is ordered, there are two tracks. One is revocation: fix the defect, prove it, and apply to the board, which usually revokes with conditions and sometimes a bank guarantee. The other is an appeal to the NGT Central Zone Bench within 30 days if the direction is wrong in law or fact. They can run together. Our page on replying to a closure notice explains the revocation route.

When Advocate B.K. Singh is asked to look at a closure direction against a crusher or mine, he starts with the board's inspection report and the date of the last consent renewal. In mining matters, the board's case often rests on dust and the absence of controls during one visit; a unit with a dated record of sprinkling, enclosures and monitoring has something to answer with, and one without it should put its effort into revocation rather than litigation.

Near Delhi

Bhiwadi, Neemrana and Rajasthan's NCR districts

Alwar and Bharatpur districts fall within the National Capital Region, so units in Bhiwadi, Neemrana and nearby estates deal not only with RSPCB but also with directions of the Commission for Air Quality Management, including the restrictions that apply under GRAP when Delhi's air quality worsens. Fuel rules for industry, limits on generator sets and curbs on construction can all apply in these districts. Our guide to GRAP stages explains what each stage brings.

For a unit in these estates, this means two sets of rules to watch. A boiler or furnace that is fine under the consent may still be barred from using a particular fuel in NCR, and a construction site may have to stop work during a high GRAP stage even with all its permissions. Residents near the estates, for their part, often complain of stack emissions, odour and contaminated groundwater; RSPCB remains the authority for those complaints.

Compensation and water

Environmental compensation and groundwater in RSPCB matters

When RSPCB finds a violation, it often levies environmental compensation, calculated by a formula based on CPCB methodology that combines the industry category, the number of days of violation and factors for scale and location. For mines and crushers the hardest question is usually the number of days, since the board may count from the start of operation rather than from the date of a proved violation. Check every input and object in writing if it is wrong.

Much of Rajasthan's groundwater is over-exploited. Industrial, mining and infrastructure users generally need a groundwater NOC under the CGWA guidelines, and dewatering in mines raises its own questions. The board looks at the source of water when it examines water balance and effluent, so a unit drawing water without permission may find that issue raised in a pollution notice.

The law

The provisions that matter in RSPCB cases

Water Act s.25 / Air Act s.21

Consent to establish and operate, for factories, mines, crushers and processing units alike.

Water Act s.28 / Air Act s.31

Appeal against refusal or conditions of consent to the state appellate authority within 30 days.

Water Act s.33A / Air Act s.31A / EP Act s.5

Closure, prohibition and disconnection. Appeals go to the NGT within 30 days, with up to 60 days more for sufficient cause.

MMDR Act 1957, s.21

Illegal mining and transport without a valid permit is punishable, and the state can seize vehicles and machinery under its rules. This is separate from RSPCB's powers.

NGT Act s.14, 15, 16

Original applications within 6 months, compensation claims within 5 years, and appeals within 30 days.

Aravallis and protected areas

Mining near the Aravallis, sanctuaries and lakes

The Aravalli hills run through much of eastern Rajasthan, and mining in them has been the subject of long litigation in the Supreme Court and the NGT. RSPCB consent is only one layer here. A mine or crusher near the Aravallis may also face questions of forest land, including the wide meaning of forest from T.N. Godavarman Thirumulpad v Union of India, and of eco-sensitive zones around protected areas such as Sariska. Our page on Aravalli cases explains these issues.

Eco-sensitive zones around national parks and sanctuaries are notified under the EP Act, and activities within them are regulated. The Supreme Court's directions on a minimum eco-sensitive zone where none was notified have been changed since they were first issued, so the position for any site must be checked at the time.

Rajasthan also has wetlands of international importance, including Sambhar Lake and Keoladeo. Activities around notified wetlands are restricted by the Wetlands Rules 2017, and salt works, construction or discharge near them raise questions beyond ordinary consent.

Illustration

Slurry on the village common

Here's a made-up example. In a village near a marble processing area, white slurry starts appearing on the common grazing land and in a seasonal nala that feeds the village pond. Over a few months the land turns hard and grey, and the pond silts up. The sarpanch complains to the tehsildar, who says it is a pollution matter.

The villagers then photograph the trucks over three weeks, noting registration numbers and times, and map the dumping spots. They write to the RSPCB regional office and the District Collector together, with the photographs, and file an RTI asking which units in the area hold consent and what their slurry conditions say. The board inspects, identifies two transporters, and issues notices to the processing units that hired them.

One unit produces weighbridge slips and dumping yard receipts for most of its loads and is let off with a warning and a direction to change transporters. Another has no records and is directed to close until it shows compliance, and to pay environmental compensation and clear the slurry from the common. The village pond is desilted at the units' cost. Had the board not acted, the same evidence would have supported an application before the NGT at Bhopal.

For residents

Complaining to RSPCB about a crusher, mine or factory

Write to the RSPCB regional office for your district. Name the unit or describe it precisely, give its location, and describe the dust, smoke, effluent, blasting or slurry, with dates and photographs. For a crusher, say how far it is from the nearest houses, school or road in your estimate; the board will measure. Ask for an inspection and action. Copy the District Collector if the problem affects a whole village or involves mining.

File an RTI for the unit's consent order, lease or permit details and recent inspections. If the board does not act within a reasonable time after a reminder, approach the NGT. Advocate B.K. Singh's usual advice to villages near crushers is to check the siting first: if the crusher is closer than the state's norms allow, that single fact is often stronger than months of dust complaints. Our guide on stone crusher siting rules explains how to check.

Our role

What we do for RSPCB matters

  • Consent planning. We check siting, category and the full chain of permissions for mines, crushers and units before applications are filed.
  • Notices. We obtain the board's material, draft point-by-point replies and attend hearings.
  • Closure. We prepare revocation applications and, where the direction is wrong, appeals to the NGT within time.
  • Appeals and writs. We appear before the state appellate authority, the NGT Central Zone Bench at Bhopal, and the Rajasthan High Court.
  • Villages and residents. We prepare complaints, RTIs and NGT applications against illegal mining, crushers, slurry dumping and effluent.
Paperwork

Documents to keep for RSPCB

Mines, crushers and processing units

  • Lease, quarry permit or allotment letter
  • Environmental clearance, if required
  • CTE and CTO with conditions
  • Sprinkling and dust control logs
  • Slurry or waste disposal receipts and weighbridge slips
  • Groundwater NOC, if water is drawn

Factories and textile units

  • CTE and CTO with conditions
  • CETP membership and bills, or ZLD records
  • Water meter and effluent flow records
  • Stack and effluent monitoring reports
  • Hazardous waste authorisation and manifests
  • Earlier notices, replies and orders
Mistakes

Mistakes that cost units and villages in Rajasthan

Units most often go wrong by treating the mining lease or industrial plot allotment as if it were the board's permission. Others run trial production before consent to operate, change machinery without amended consent, or rely on a transporter to deal with slurry and waste without keeping receipts. In water-scarce districts, drawing groundwater without the required permission adds another violation to the list.

Villages lose time by complaining only orally to the panchayat or tehsil, by complaining about several units together without saying which does what, and by waiting too long after a one-time event. For ongoing pollution the NGT's time limit is less of a problem, but the application must show recent evidence that the harm is continuing.

Related

Related pages

Groups with units in neighbouring states can see our pages on the Punjab Pollution Control Board and the Gujarat Pollution Control Board. For local help, see our pages for an environmental lawyer in Jodhpur and for Bhiwadi and Neemrana industries.

FAQs

Frequently Asked Questions

Which NGT bench hears cases from Rajasthan?

The NGT Central Zone Bench at Bhopal. Matters are often heard by video conference.

Does a stone crusher in Rajasthan need RSPCB consent?

Yes. Stone crushers need consent to establish and operate, and must meet the state's siting norms.

Is a mining lease enough to start mining?

No. Mining also needs environmental clearance, RSPCB consent, and forest clearance if forest land is involved.

Where do I appeal if RSPCB refuses consent?

To the state appellate authority under section 28 of the Water Act or section 31 of the Air Act within 30 days, and then to the NGT.

How long do I have to challenge an RSPCB closure direction?

30 days from communication, by appeal to the NGT Central Zone Bench, extendable by up to 60 days for sufficient cause.

Does the 2024 Water Act amendment apply in Rajasthan?

Yes. Rajasthan was one of the states whose resolutions led to the amendment, so it applies here.

Who is responsible if a transporter dumps our marble slurry illegally?

The board can hold the processing unit responsible. Keep weighbridge slips and dumping yard receipts for every load.

Can villagers stop a crusher near their homes?

If it breaches siting norms or runs without consent or controls, the board can act, and the NGT can be approached if it does not.

Where do I file a writ against RSPCB?

In the Rajasthan High Court at Jodhpur or its Jaipur Bench, though the court usually sends NGT Act disputes to the NGT.

Do textile units in Pali or Balotra need ZLD?

Many have CETP or ZLD conditions in their consent. Check your own consent order for the exact requirement.

Can RSPCB levy environmental compensation?

Yes, using a CPCB-based formula. Check the category, days of violation and other inputs before accepting it.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Need help with RSPCB?

Send us the consent order, notice or closure direction, or a short description of the problem, on WhatsApp or by phone. We will tell you the deadline and the realistic next step.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.

Need help with Dealing With the Rajasthan State Pollution Control Board (RSPCB)?

Send us the notice, the order or a few photos. We'll tell you where you stand, which authority or NGT bench deals with it and when the next step is due, in plain words.

 +91-9315261599 Schedule Your Consultation