EC Conditions Not Followed: How to Complain and What Happens

Project ignoring its environmental clearance conditions? Find the EC letter, collect proof, complain to the right authority and know when to go to the NGT.

Written by the environmental law practice of Advocate BK Singh, which acts before the pollution boards, environment authorities and the National Green Tribunal.

Get A Free Consultation

Last reviewed: October 2026

If a project is ignoring the conditions of its environmental clearance (EC), you can complain to the authority that monitors those conditions and, if nothing happens, take the matter to the National Green Tribunal. For central (category A) clearances that is the MoEFCC's regional office; for state (category B) clearances it is the State Environment Impact Assessment Authority (SEIAA), usually with the State Pollution Control Board. A complaint works when it names the exact condition, shows how it is broken and attaches proof.

Short answer: Get a copy of the EC letter and the project's six-monthly compliance reports, match each broken condition to photos or documents, and send a written complaint to the MoEFCC regional office (category A) or the SEIAA and State Board (category B). If they do not act, an application under section 14 of the NGT Act can ask the tribunal to enforce the conditions.

This guide is for residents, villagers, RWAs and project neighbours who know a project has an EC but can see it is not keeping its promises: the green belt is missing, the dust nets came down months ago, the STP was never built, groundwater is being pumped without permission. It explains where to find the conditions, who checks them, how to complain, and what the authorities and the NGT usually do. If you think the project never had an EC at all, our page on projects running without environmental clearance covers that situation.

If you want to cancel the clearance itself because it should never have been granted, that is an appeal, not a compliance complaint, and the deadline is far shorter. Our page on challenging an environmental clearance in the NGT explains that route.

Category A monitorMoEFCC regional office
Category B monitorSEIAA, with the State Board
Compliance reportsFiled every six months by the project
NGT routeSection 14 application (EP Act matter)
NGT time limit6 months from cause of action, plus up to 60 days
Appeal against EC grant30 days under section 16, plus up to 60 days

हिंदी में सारांश

अगर कोई प्रोजेक्ट अपनी पर्यावरण मंजूरी (EC) की शर्तें नहीं मान रहा, जैसे ग्रीन बेल्ट नहीं लगाई, धूल नियंत्रण नहीं किया, STP नहीं बनाया या बिना अनुमति भूजल निकाल रहा है, तो आप शिकायत कर सकते हैं। पहले EC पत्र और प्रोजेक्ट की छह-मासिक अनुपालन रिपोर्ट हासिल करें, जो सार्वजनिक दस्तावेज हैं और RTI से भी मिल सकती हैं। फिर हर टूटी हुई शर्त के सामने फोटो या दस्तावेज लगाकर लिखित शिकायत भेजें: केंद्र की मंजूरी (श्रेणी A) के लिए MoEFCC के क्षेत्रीय कार्यालय को और राज्य की मंजूरी (श्रेणी B) के लिए SEIAA और राज्य प्रदूषण नियंत्रण बोर्ड को। कार्रवाई न हो तो NGT अधिनियम की धारा 14 के तहत NGT में आवेदन किया जा सकता है।

In short

The essentials

Start with the EC letter

Every complaint should quote the condition number from the clearance letter, not a general grievance.

Compliance reports are public

Projects file six-monthly compliance reports, and comparing them with the ground often exposes false claims.

Know who monitors

The MoEFCC regional office checks central clearances; the SEIAA and State Board check state clearances.

Breach is not the same as a bad EC

Breaking conditions is a compliance matter; attacking the grant itself is an appeal with a 30-day limit.

The NGT can enforce

Under section 14 the tribunal can direct compliance, order inspection and impose environmental compensation.

Do not sit on it

File while the breach is visible and recent, so time limit arguments do not distract from the facts.

The first question

A project is not following its EC conditions. Where do I complain?

Complain to the authority that granted or monitors the clearance, in writing, with the condition numbers listed. For a category A project (large mines, thermal plants, big industrial projects, new national highways and the like), the EC is issued by the MoEFCC and its compliance is checked by the ministry's regional office for your state. For a category B project, which includes most building and construction projects of 20,000 sq m built-up area and above, the EC is issued by the SEIAA, and the SEIAA works with the State Pollution Control Board (DPCC in Delhi) to check compliance on the ground.

Send a copy to the State Board in every case. Most EC conditions on air, water, noise, waste and STPs are repeated in the project's consent to establish and consent to operate, and the board has inspection teams and the power to issue directions under section 33A of the Water Act and section 31A of the Air Act. The board can act within days. The SEIAA or the regional office often takes longer, because it has fewer field staff.

If the breach is causing immediate harm, such as dust from an uncovered site or sewage from an unbuilt STP, copy the District Magistrate and the local body too. They do not monitor ECs, but they control the site in practical ways and usually sit on any joint committee the NGT appoints later.

Know what was promised

What are EC conditions, and which ones are broken most often?

An environmental clearance is not a bare permission. It is a letter that allows a project on stated terms, and those terms are the conditions. They come in two parts: specific conditions written for that project after the expert committee looked at its EIA report, and general or standard conditions that apply to most projects of that type. Breaking any of them is a breach of the EC, and the clearance itself usually says that non-compliance can lead to suspension or revocation and to action under the Environment (Protection) Act.

In building and township projects, the conditions most often ignored are the green area, the size and working of the STP, reuse of treated water, rainwater harvesting, dust control during construction and the cap on groundwater use. In mines and crushers, it is usually dust suppression, the mining plan boundary, haul roads, boundary plantation and limits near water bodies. In industries, it is stack monitoring, effluent treatment, the green belt and online monitoring.

Then there are the quiet breaches: corporate environment responsibility money never spent, public hearing promises written into the EC and forgotten, monitoring stations that exist on paper, compliance reports copied word for word from the last one. These show a pattern, and a pattern is what moves an authority or the tribunal.

Who checks what

Which authority deals with which kind of EC breach

The usual arrangement. Send your complaint to the main authority and copy the others.

SituationMain authorityAlso copy
Category A project (large mine, power plant, big industry, new national highway)MoEFCC regional office for your stateState Board, CPCB, DM
Category B project (most housing and commercial buildings, smaller mines and industries)SEIAA of the stateState Board, regional office of the board, DM
Air, water, noise or waste conditions that also appear in the consentState Pollution Control Board (DPCC in Delhi)SEIAA or MoEFCC regional office
Groundwater extraction beyond what the EC allowsCGWA or the state groundwater authoritySEIAA or MoEFCC regional office, State Board
Trees felled or green belt not plantedTree officer or forest department, plus the EC authorityDevelopment authority, State Board
Mining outside the plan or leaseState mining department and DMEC authority, State Board, police for illegal transport

The EC letter says who issued it: a letter from the MoEFCC means category A, one from the SEIAA means category B.

Getting the papers

How do I find out what conditions the project actually has?

Get the EC letter first, because without it you are guessing. Most EC letters require the project to put the clearance on its website and send copies to the local body, and large projects' clearances and compliance reports are usually on the MoEFCC's online clearance system (PARIVESH). Otherwise, an RTI to the SEIAA or the MoEFCC regional office will get it within 30 days.

Ask for the six-monthly compliance reports in the same RTI. Under the EIA Notification 2006, the project must report on its compliance with each condition every six months, and these reports are public documents. Read them side by side with the site. A report that says "green belt fully developed" for a plot that is entirely paved is the most useful document you will get, because it is the project's own statement and it is false.

Also ask for any site inspection report from the regional office or SEIAA, and from the State Board the consents, inspection reports, sample reports and any show-cause notices with replies. Keep the RTI narrow: one project, named documents, a date range. Broad RTIs come back as "information not specific" and you lose a month.

Evidence

What to collect before you complain

Project papers

  • EC letter with all annexures and any amendment
  • Last two or three six-monthly compliance reports
  • Consent to establish and consent to operate from the State Board
  • Approved layout or site plan showing green area and STP location

Proof from the ground

  • Dated photos and short videos from the same spots over several weeks
  • Satellite images from free mapping tools showing change over time
  • Your own log of dust, noise, odour, truck movement or overflow with dates and times
  • Water or air test reports from a recognised laboratory, if you can arrange one

Your own record

  • Copies of every complaint you send, with proof of delivery
  • Replies received, or a note that none came
  • RTI applications, first appeals and replies
  • Names of officials who visited and what they said, noted the same day
Step by step

How to complain about EC conditions not being followed

This order builds a record that the authority cannot ignore and that the NGT will later read.

1

Get the EC and compliance reports

Download them or file an RTI to the issuing authority. Note every condition that you believe is being broken, with its number.

2

Prove each breach separately

For each condition, collect a photo, document or test report that shows the breach. One strong proof per condition is better than fifty photos of the same thing.

3

Write one clear complaint

Address it to the MoEFCC regional office or the SEIAA, with copies to the State Board, CPCB and the DM. Use a short table: condition number, what it requires, what is happening, proof attached.

4

Send it in a way you can prove

Use email to the official addresses and registered post or speed post, or hand delivery with a receiving stamp. Keep the tracking record.

5

Follow up after three to four weeks

Write again quoting the first complaint's date. Ask specifically whether an inspection has been ordered and when.

6

Use RTI to see what happened

Ask for the file noting on your complaint, any inspection report and any notice issued. This often reveals that the complaint was simply forwarded and closed.

7

Decide on the NGT

If there is no inspection, a cosmetic inspection or no action after a clear finding, an application under section 14 of the NGT Act can seek enforcement, inspection by a joint committee and compensation.

Drafting

Writing an EC complaint that officials actually act on

Lead with the project's identity: the name of the project proponent, the EC letter number and date, the site address and the category. Officials handle hundreds of files, and a complaint that does not let them find the file quickly goes to the bottom of the pile. Put the condition table on the first page and the background later.

Ask for specific things. An inspection within a stated time, a show-cause notice, directions to stop the particular activity (construction beyond the approved floors, mining in a particular block, use of a borewell), and suspension of the EC if the breaches continue. If you want a joint inspection with residents present, ask for it. If you suspect the compliance report is false, say so plainly and point to the line.

Keep each allegation within what you can prove. If you only suspect the STP is undersized, say that and ask the board to check its capacity against the EC. Overstating one point lets the project rebut the whole complaint by disproving that one point.

When Advocate B.K. Singh drafts EC compliance complaints for RWAs and villages, he puts the condition-by-condition table up front, because the same table later becomes the core of the NGT application if the authority does nothing.

After the complaint

What happens after I complain about an EC violation?

If the complaint is taken seriously, the authority orders a site inspection: officers of the MoEFCC regional office for category A, or the State Board at the SEIAA's request for category B. The report should record, condition by condition, whether each is complied with, partly complied with or not complied with.

If breaches are found, the next step is usually a show-cause notice giving the project a short time to explain or comply. Many projects then fix the visible problems quickly: dust nets go back up, saplings are planted, the STP is commissioned. Sometimes that is all you wanted. Sometimes it is cosmetic, and you need to keep watching.

For serious or repeated breaches, the authority can issue directions under section 5 of the Environment (Protection) Act, which can include stopping construction or operations, closure, or stopping electricity and water supply. The State Board can issue similar directions under the Water and Air Acts. The EC can be suspended or revoked, though in practice authorities prefer to direct compliance with a deadline and to demand environmental compensation or a bank guarantee. Since the Jan Vishwas (Amendment of Provisions) Act 2023, many violations under the EP Act attract monetary penalties decided by an adjudicating officer instead of prosecution.

If nothing happens, and that is common, the complaint has still done its work. It shows the NGT that you went to the right authority first and were ignored.

Possible outcomes

What the authorities can do when EC conditions are broken

ActionWho can take itWhen it is usually used
Inspection and reportMoEFCC regional office, SEIAA, State BoardFirst response to a credible complaint
Show-cause noticeAny of the aboveBreach found, project given a chance to explain
Direction to comply by a dateEC authority or State BoardBreach can be fixed, such as plantation, STP or dust control
Stop work or closure directionEP Act s.5; Water Act s.33A; Air Act s.31ASerious or continuing breach, or harm to residents
Suspension or revocation of ECThe authority that granted itRepeated or deliberate breach, false compliance reports
Environmental compensation or bank guaranteeState Board, CPCB, NGTPast damage must be paid for, future compliance secured
The tribunal

When should I take EC violations to the NGT?

Go to the NGT when the authorities have had a fair chance and have not acted, or when waiting would make the harm irreversible. Breach of EC conditions is a dispute under the Environment (Protection) Act, which is in Schedule I of the NGT Act, so the tribunal can hear it under section 14. If people or property have been harmed, you can also seek compensation and restoration under section 15.

The time limit under section 14 is six months from when the cause of action first arose, with up to 60 more days for sufficient cause. For a breach that continues every day (an STP that never runs, a green belt that never comes), there is a reasonable argument that the cause of action continues, but you should not rely on that if you can file early. Read our guide on NGT time limits before you decide.

Do not confuse this with an appeal against the EC itself. If your complaint is that the clearance should never have been granted (a faulty EIA report, a public hearing that was rigged or skipped, a wrong category), you must appeal under section 16 within 30 days of the order being communicated, extendable by 60 days. Our guides on mistakes in an EIA report and objections at a public hearing deal with those grounds.

In practice, the NGT often forms a joint committee (commonly the CPCB or MoEFCC regional office, the State Board and the DM) to inspect the site and report on each condition. Parties can object to the report. Many applications end with directions to ensure compliance within a fixed time and with environmental compensation on the polluter pays principle. If the directions are ignored, an execution application follows.

Illustration

A housing project that forgot its green belt and STP

Here's a made-up example. A builder gets an EC from the SEIAA for a group housing project on the edge of a town in western Uttar Pradesh. The EC requires a green belt along the rear boundary, an STP of a stated capacity, dual plumbing to reuse treated water, and no groundwater extraction beyond a fixed quantity without CGWA permission. Three years later, the rear boundary has a row of shops, sewage from occupied towers is going into an open drain, and two borewells run round the clock.

The residents' association files an RTI and gets the EC and the last four compliance reports. Every report says the green belt is "being developed" and the STP is "operational". The RWA sends a two-page complaint to the SEIAA and UPPCB with a table of five conditions, photos of the shops and the drain outfall, and the RTI reply from the board showing no consent to operate for any STP on the site. A board inspection follows and confirms the discharge, and a show-cause notice is issued. Months pass with no further step.

The RWA then files an application in the NGT under section 14. The tribunal appoints a joint committee of the CPCB, UPPCB and the DM, whose report confirms three breaches. The tribunal directs the builder to commission a working STP within a fixed period, restricts borewell use and asks the board to assess environmental compensation. The shops on the green belt go back to the development authority under the sanctioned plan. Not every case ends this way, but the order of steps is typical.

What goes wrong

Mistakes people make with EC violation complaints

  • Complaining without the EC letter. A complaint that says the project is "violating environmental norms" gives the authority nothing to check and is easy to close.
  • Sending it only to the State Board. The board can act on overlapping consent conditions, but the EC authority is the one that can suspend or revoke the clearance.
  • Mixing in unrelated disputes. Delayed possession, parking allotment and maintenance charges belong in RERA or consumer forums. Put them in an EC complaint and the environmental point gets buried.
  • Treating a quick fix as the end. Projects often comply visibly for a few weeks after an inspection. Keep photographing for months afterwards.
  • Filing an appeal when the problem is compliance. Attacking the grant after the 30-day appeal window has closed fails on limitation. If the conditions are good but ignored, enforce them instead.
For project proponents

If you are the developer and have received an EC breach notice

Reply to a show-cause notice within time, condition by condition, with evidence of what has been done and a realistic schedule for the rest. The authority will read that reply again if the matter reaches the NGT. If earlier compliance reports overstated the position, correct them now: a false report turns a technical breach into a question of good faith.

Where a condition cannot be met as written, apply for an amendment of the EC instead of quietly ignoring it. Our guide on expansion without an EC amendment explains what happens when that step is skipped, and our page on pollution board notices covers replies and appeals against directions.

Quick checks

Before you file an EC violation complaint

  • Do you have the EC letter, with its number and date?
  • Have you listed each broken condition by its number?
  • Is there at least one dated proof for each condition?
  • Have you read the latest compliance report and marked false statements?
  • Is the complaint addressed to the right authority for the project's category?
Related reading

Other guides on environmental clearance

If the project has changed hands and you are not sure who is now bound by the conditions, see our guide on transfer of environmental clearance. Housing societies dealing with STPs after handover should read our guide on society and builder disputes over STP and EC, and when you are ready to file, how to file a case in the NGT walks through the steps.

FAQs

Frequently Asked Questions

Where can I see the conditions of a project's environmental clearance?

In the EC letter, which projects are usually required to put on their website and send to the local body. You can also get it, along with the compliance reports, through an RTI to the SEIAA or the MoEFCC regional office.

Who monitors EC conditions for a housing project?

Most housing projects above 20,000 sq m get their EC from the SEIAA, which monitors compliance with help from the State Pollution Control Board. Send your complaint to both.

What is a six-monthly EC compliance report?

It is a report the project must file every six months stating how it is meeting each EC condition. It is a public document and is often the best evidence that the project is misreporting.

Can an environmental clearance be cancelled for not following conditions?

Yes. The authority that granted it can suspend or revoke it for serious or repeated breaches, though authorities usually first direct compliance and impose compensation.

Can I complain to the NGT directly about EC violations?

You can, but the tribunal usually wants to see that you approached the monitoring authority first. A record of ignored complaints makes your application stronger.

What is the time limit for an NGT case on EC violations?

Six months from when the cause of action first arose under section 14, with up to 60 more days for sufficient cause. A breach that continues daily may give a continuing cause of action, but file early.

Is breaking EC conditions a criminal offence?

After the 2023 Jan Vishwas amendments, many EP Act violations attract monetary penalties from an adjudicating officer rather than prosecution. Directions, closure and compensation remain available.

Does an RWA have the right to complain about a builder's EC violations?

Yes. Any person aggrieved, including a residents' body, can complain to the authorities and apply to the NGT under section 18 of the NGT Act.

What if the project says it has fixed the problem after inspection?

Keep checking and ask for a fresh inspection after a few months. Quick fixes after a notice are common and often temporary.

Can I get compensation if EC violations damaged my property or health?

You can claim relief and compensation under section 15 of the NGT Act within five years, plus up to 60 days. You will need proof of the damage and its link to the project.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Project ignoring its EC conditions?

Send us the project name, what you are seeing on the ground and any EC letter or RTI reply you have, on WhatsApp or by phone. We will tell you which authority to approach and whether the matter is ready for the NGT.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.