Project Without Environmental Clearance or Breaking EC Conditions

Project running without environmental clearance or breaking EC conditions? Who to complain to, how to prove it, what the NGT does and what owners should do.

Advice and representation before the pollution boards, environment authorities and the National Green Tribunal, for industries, builders, hospitals, RWAs and residents, led by Advocate BK Singh.

Get A Free Consultation

Last reviewed: October 2026

If a project that needs an environmental clearance (EC) has started work without one, or is ignoring the conditions written into its EC, it is acting in breach of the EIA Notification 2006 and the Environment (Protection) Act. Residents can complain to the MoEFCC regional office or the SEIAA and the State Pollution Control Board, and if nothing happens, file an original application in the National Green Tribunal under section 14 of the NGT Act within six months. The tribunal can stop work, order inspections and impose environmental compensation. Project owners who receive a violation notice have options too, but delay makes every one of them worse.

Short answer: A project needing prior EC cannot prepare land or build before the EC is granted, and must follow every EC condition. Complain in writing to the MoEFCC regional office or SEIAA and the state board, then file a section 14 application in the NGT within six months if they do not act.

This page covers two linked problems: projects that never got the clearance they needed, and projects that got one but treat its conditions as optional. It is written for neighbours, villagers and RWAs who want the work stopped or corrected, and for builders and industries who have been told they are in violation. If an EC has been granted and you think it should never have been, that is an appeal with a 30-day deadline, explained on our page on how to challenge an environmental clearance in the NGT.

For help with obtaining or correcting a clearance from the start, see our environmental clearance services.

LawEIA Notification 2006 under the EP Act
Prior EC ruleNo land preparation or construction before EC
Who monitorsMoEFCC regional office, SEIAA, state board
NGT routeSection 14, within 6 months, plus up to 60 days
Compensation claimSection 15, within 5 years, plus up to 60 days
Building threshold20,000 sq m built-up area and above

हिंदी में सारांश

जिन प्रोजेक्ट को EIA अधिसूचना 2006 के तहत पहले से पर्यावरण मंजूरी (EC) लेनी होती है, वे मंजूरी मिलने से पहले न जमीन तैयार कर सकते हैं, न निर्माण शुरू कर सकते हैं। EC मिलने के बाद उसकी हर शर्त, जैसे ग्रीन बेल्ट, STP, भूजल सीमा और निगरानी रिपोर्ट, माननी होती है। अगर कोई प्रोजेक्ट बिना EC के चल रहा है या शर्तें तोड़ रहा है, तो पर्यावरण मंत्रालय के क्षेत्रीय कार्यालय या SEIAA और राज्य प्रदूषण नियंत्रण बोर्ड को लिखित शिकायत करें। कार्रवाई न हो तो NGT में धारा 14 के तहत छह महीने के अंदर आवेदन किया जा सकता है। NGT निरीक्षण समिति बना सकता है, काम रुकवा सकता है और पर्यावरण क्षतिपूर्ति लगा सकता है। प्रोजेक्ट मालिक को नोटिस मिले तो तुरंत जवाब दें।

In short

The essentials

Prior means prior

Land preparation and construction must wait for the EC, apart from securing the land.

Conditions are binding

Every condition in the EC letter is enforceable, not a suggestion.

Check before you complain

Confirm the project actually needs an EC and whether one exists, using the public record or RTI.

Several regulators can act

The MoEFCC regional office, the SEIAA and the state board all have powers here.

Six months for the NGT

A section 14 application should be filed within six months, so do not let complaints drag on.

Compensation is likely

The NGT commonly orders environmental compensation on the polluter pays principle.

First check

Does this project actually need an environmental clearance?

Start here, because many complaints fail on this point. The EIA Notification 2006 has a schedule of projects that need prior EC: mining, thermal power, large industries such as cement, chemicals, fertilisers, distilleries and pharmaceutical bulk drugs, ports, highways, airports, large building and construction projects, and townships. Building projects of 20,000 sq m built-up area and above need EC, generally from the SEIAA; townships and area development projects of 1,50,000 sq m and above fall in a higher category.

Plenty of polluting activity does not need an EC at all. A small dyeing unit, a brick kiln or a DG set in a market is regulated through consents from the state board and the relevant rules, not the EIA Notification. If you complain about a missing EC for a unit that never needed one, the authority will close your complaint and you will have lost months.

To find out whether an EC exists, search the regulator's website and the national clearance portal by project name or proponent, check the SEIAA's list of approvals, and look at the sanctioned building plan, which often refers to the EC. If you find nothing, file an RTI with the SEIAA or the MoEFCC regional office asking whether an EC was applied for or granted. Our guide on when a building project needs environmental clearance covers the construction thresholds in more detail.

What counts

What counts as an EC violation?

The clearest violation is starting without EC. The notification requires prior clearance before any construction work or preparation of land, other than securing the land. Excavating a basement, levelling a mining area, cutting trees for site clearance or laying foundations while the application is still pending all count. A project that says it has "applied for EC" is not cleared.

The second category is operating beyond the EC. Producing more than the capacity in the clearance, adding new products, extending the built-up area, or extending a mine beyond the approved area each needs prior approval. Our guide on expanding a project without EC amendment deals with this in depth.

The third category is ignoring the conditions. EC letters contain specific and general conditions: the green belt, rainwater harvesting, the STP and reuse of treated water, limits on groundwater drawal, dust controls, ambient air and water monitoring, solid waste handling, and six-monthly compliance reports. A breach of any of them is a violation, though the regulator's response is usually in proportion to the harm. Detailed guidance on condition breaches is in our guide on EC conditions not followed.

A fourth, often missed, category is working on an EC that has lapsed. ECs have a validity period that depends on the type of project. A project that has not started or completed within that period and has not obtained an extension is effectively without a clearance.

Who acts

Types of violation and who deals with them

ViolationMain authorityWhat usually happens
Construction or mining started with no ECSEIAA or MoEFCC, and the state boardStop-work direction, violation proceedings, possible closure under EP Act section 5
Capacity or area expanded beyond the ECAuthority that granted the ECDirection to stop the expanded part, penalty and compensation
EC conditions ignored (STP, green belt, monitoring)MoEFCC regional office or SEIAAInspection, show-cause notice, directions to comply, compensation
Compliance reports not filedAuthority that granted the ECNotice, and a closer look at actual compliance
Running without consent because there is no ECState Pollution Control BoardRefusal of consent, closure or disconnection directions
Building occupied without EC or complianceSEIAA and the development authorityQuestions over completion or occupancy, compensation
The law

The law in plain words

EIA Notification 2006

Issued under the Environment (Protection) Act, 1986. It lists the projects that need prior EC, sets out screening, scoping, public consultation and appraisal, and requires the proponent to follow the conditions and file six-monthly compliance reports. Deliberate concealment or false material information can lead to rejection of the application or cancellation of the EC.

EP Act section 5

Allows the Central Government (and authorities to whom the power is delegated) to issue directions, including closure, prohibition or regulation of any industry or operation, and stopping of electricity, water or other services. A direction under section 5 can be appealed to the NGT under section 16 of the NGT Act.

EP Act penalties

After the Jan Vishwas (Amendment of Provisions) Act 2023, many contraventions of the EP Act are dealt with by monetary penalties decided by an adjudicating officer instead of criminal prosecution. The exact provision and amount depend on the contravention, so check the current text.

Water and Air Acts

A unit that needs an EC also needs consent to establish and consent to operate from the state board. Boards commonly refuse or withhold consent where the EC is missing, and can order closure or disconnection under Water Act section 33A and Air Act section 31A.

NGT Act sections 14, 15 and 20

Section 14 lets the NGT decide substantial environmental disputes arising from the EP Act, which includes EC violations. Section 15 provides for compensation and restitution of the environment. Section 20 directs the tribunal to apply sustainable development, the precautionary principle and polluter pays.

Routes for residents

Where should neighbours and villagers complain first?

Write to the authority that grants or would grant the EC. For category A projects, that is the MoEFCC, and complaints about compliance go to its regional office for the state. For category B projects, including most building projects, it is the SEIAA. Send a copy to the State Pollution Control Board, because the board controls consents and has closure powers of its own. Keep the complaint factual: the project name, the location, what you have seen, the dates, and the documents you rely on.

For building projects, also write to the development authority or municipal body that sanctioned the plan. It controls building permission and completion, and a missing EC is a reason to question both. For mining, write to the district mining officer and the DM, who control leases and transit passes.

Give the authorities a fair chance, usually four to eight weeks, and follow up in writing. Then move. The NGT does not insist that you exhaust every complaint first, and if work is progressing fast, the harm can become irreversible while files move between offices. A copy of your unanswered complaints is useful evidence that the regulators did not act.

Step by step

How to stop a project that is working without EC or breaking conditions

1

Confirm the EC position

Search the public record and file an RTI asking whether an EC was applied for, granted, and with what conditions. Ask the state board for the consent orders too.

2

Record the work with dates

Take dated photographs and videos from public places, note truck movements and working hours, and save satellite images that show when excavation or construction began.

3

Compare with the EC

If an EC exists, list the conditions being broken: missing green belt, borewells beyond the permitted drawal, no dust barriers, STP not built, monitoring not done.

4

Complain in writing

Send a signed complaint to the MoEFCC regional office or SEIAA, the state board and the local authority, by email and post, and keep the proof of dispatch.

5

Follow up and collect replies

Chase the complaint after four weeks. Ask for the inspection report under RTI if an inspection takes place.

6

File in the NGT if there is no action

File an original application under section 14 within six months, with the authorities and the proponent as respondents, and ask for an inspection and interim directions.

7

Engage with the committee

If the NGT appoints a joint committee, give it your evidence and file objections if its report misses the point.

8

Pursue compliance after the order

If directions are ignored, file an execution application. Non-compliance with an NGT order is punishable under section 26.

Evidence

How do you prove a project started before its EC?

Timing is everything. You need to show that land preparation or construction happened on dates before the EC was granted, or work happened outside what the EC allows. Satellite imagery available for different dates is often the most persuasive evidence, because it is independent and dated. Combine it with your own dated photographs, local newspaper reports and complaints made at the time.

For capacity and area violations, the documents are usually with the regulators. The consent to operate states the permitted production; the EC states the approved capacity or built-up area; the sanctioned building plan shows the floor area. Production figures can show up in annual returns, environmental statements filed with the state board, and the proponent's own compliance reports. Ask for all of them under RTI.

For condition breaches, the proponent's six-monthly compliance reports are a good starting point. Many simply repeat "complied" against every condition. A green belt that is reported as planted but is visibly bare land, or groundwater drawal reported within limits while new borewells appear on site, makes a strong contrast. Our guide on photos, lab reports and RTI replies as NGT evidence explains how to present this material so it is taken seriously.

In the tribunal

What does the NGT usually do in an EC violation case?

In most cases the tribunal first wants verified facts. It commonly forms a joint committee, often of the state board, a representative of the MoEFCC regional office or SEIAA and the District Magistrate, to inspect the site and report within a few weeks. The report becomes the centre of the case, so it matters what you put before the committee and how you respond to its findings. See our guide on objecting to a joint committee report.

If the report confirms the violation, typical directions include stopping further work until the legal position is regularised or the EC conditions are met, restoring damaged areas, completing the green belt or STP within a fixed time, and paying environmental compensation. Boards and the CPCB use a formula-based method for compensation; our guide on what environmental compensation means explains the factors involved.

Demolition is ordered less often than people expect, and closure tends to be reserved for serious or repeated violations or where the harm cannot be controlled. That is not a reason for residents to give up. Even where the project survives, firm conditions, monitoring and compensation change how it operates.

For project owners

You have received a violation notice: what should a builder or industry do?

Treat it as serious from day one. A show-cause notice from the SEIAA, the MoEFCC regional office or the state board usually sets a short time to reply, and silence is often followed by directions to stop work or closure under section 5 of the EP Act. Reply in substance, with documents: when the EC was applied for, what work was done and when, what has been done to comply since, and a time-bound plan for the rest.

Do not make claims you cannot support. Saying that excavation was only "soil testing" when satellite images show a full basement will damage your credibility for the rest of the case. If work began before the EC, say so and focus on remediation and the legal route available now. That route has changed several times. The question of whether a project that started without EC can be regularised has been before the Supreme Court repeatedly; our guide on post-facto environmental clearance explains why you need current advice before choosing a strategy.

Get your compliance paperwork in order quickly. Missing six-monthly reports are an easy point for a regulator or an opponent in the NGT. Our EC compliance report service and environmental penalty defence work cover both the filings and the response to penalty proceedings.

Documents

What to gather

If you are complaining

  • RTI reply on EC status
  • EC letter and conditions, if one exists
  • Dated photos, videos and satellite images
  • Copies of complaints and dispatch proof
  • Any inspection report obtained

If you are the project owner

  • EC application and correspondence
  • EC letter, amendments and extensions
  • Consent orders from the state board
  • Six-monthly compliance reports
  • Sanctioned plans and construction timeline
Our role

What we do in EC violation matters

  • Checking the facts first. We confirm whether the project needed an EC, whether it has one and what it permits, before anyone files anything.
  • Building the evidence. We draft RTI applications, help assemble a dated record of the work and match it against the EC and consents. In violation cases Advocate B.K. Singh has handled, a simple timeline placing satellite images beside the EC date has often done more than pages of argument.
  • Complaints that get read. We draft complaints to the regional office, SEIAA, board and local authority that set out the violation, the law and the action sought.
  • NGT applications. We file section 14 applications with interim prayers, and section 15 claims where people have suffered damage.
  • Defending proponents. We reply to show-cause notices, appear in violation proceedings and in the NGT, and help plan compliance and remediation.
  • Follow-through. We track compliance with the tribunal's directions and file execution applications if they are ignored.
Avoid these

Common mistakes on both sides

Residents often wait for the building to be finished before acting, believing they must first prove harm. The violation is complete the day work begins without EC, and the six-month clock under section 14 runs from when the cause of action first arose. The NGT has in many cases treated an ongoing breach as a continuing cause of action, but relying on that is risky. Our guide on continuing cause of action in NGT cases explains where the line usually falls.

Another common error is mixing an EC complaint with every other grievance against the builder, such as delayed possession or parking. Those belong before RERA or a consumer commission. Keep the environmental case focused.

On the other side, proponents tend to think that once an application is pending, work can proceed quietly. It cannot. They also underestimate how much a regulator or tribunal relies on the proponent's own reports. A report claiming full compliance that turns out to be false is far more damaging than an honest report of partial compliance with a plan.

Illustration

A commercial complex digs its basement before the EC

Here's a made-up example. A developer begins excavating a three-level basement for a commercial complex with a planned built-up area of about 45,000 sq m, beside a residential colony. Pumps run day and night to dewater the pit, and within weeks residents notice their borewells dropping. The site board says "EC applied for".

The RWA files an RTI with the SEIAA, which confirms that the application is pending and no EC has been granted. They write to the SEIAA, the state board and the development authority, attaching photographs and a satellite image showing the pit's growth over two months. A board officer visits but no direction follows.

Two months after the first complaint, the RWA files an original application in the NGT. The tribunal forms a joint committee, which confirms the excavation and large-scale dewatering without EC or groundwater permission. The tribunal directs that no further work take place until the EC and other permissions are in place, asks the committee to assess environmental compensation, and requires the developer to submit a dewatering and recharge plan. In a real case the result would depend on the facts and the law at the time, but the RWA's dated record is what made the committee's job easy.

Related guides

Further reading

For the specific question of what happens when an existing unit or building grows beyond its clearance, read our guide on expansion without EC amendment. If your concern is the SEIAA's role and procedure, our SEIAA services page explains how state-level clearances are handled.

FAQs

Frequently Asked Questions

Can a builder start construction while the EC application is pending?

No. The EIA Notification requires prior EC before any construction work or land preparation, apart from securing the land. A pending application is not permission.

Where do I complain about a project without environmental clearance?

Write to the SEIAA for category B projects or the MoEFCC and its regional office for category A projects, with a copy to the State Pollution Control Board and the local authority.

How do I check if a project has an EC?

Search the regulator's website and the national clearance portal by project or company name. If nothing turns up, file an RTI with the SEIAA or the MoEFCC regional office.

Can I go straight to the NGT without complaining first?

Yes, the NGT does not require you to exhaust complaints first. Prior written complaints still help show that the authorities were told and did not act.

What is the time limit for an NGT case against a project without EC?

Six months from when the cause of action first arose under section 14, plus up to 60 days for sufficient cause. File promptly rather than relying on a continuing cause of action.

What penalty applies for working without environmental clearance?

The authority can direct closure or stoppage under section 5 of the EP Act, monetary penalties can be imposed by an adjudicating officer, and the NGT can order environmental compensation.

Does every factory need an environmental clearance?

No. Only projects listed in the schedule to the EIA Notification need EC. Most smaller units need consent from the state board instead.

Who checks whether EC conditions are being followed?

The MoEFCC regional offices monitor category A projects and the SEIAA monitors category B projects, along with the state board for consent conditions.

Can the NGT order demolition of a building built without EC?

It can, but more often it stops further work, orders remediation and imposes compensation. Demolition tends to be reserved for serious cases.

What should a project owner do after receiving a notice for EC violation?

Reply within the time given, with documents and a realistic compliance plan, and take advice on the current legal route before admitting or contesting facts.

Can residents claim compensation for damage caused by an EC violation?

Yes. Section 15 of the NGT Act allows claims for relief and compensation within five years of the cause of action, plus up to 60 days.

Is not filing six-monthly compliance reports a violation?

Yes. Filing compliance reports is a condition of the EC, and failure to file invites notices and closer scrutiny of actual compliance.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Work going on without clearance next door?

Send us photographs, the project name and any notice or RTI reply on WhatsApp or by phone. If you are the project owner, send the notice you received. We will tell you where things stand and what to do first.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.

Need help with Project Without Environmental Clearance or Breaking EC Conditions?

Send us the notice, the order or a few photos. We'll tell you where you stand, which authority or NGT bench deals with it and when the next step is due, in plain words.