A cement plant is regulated at three levels: it needs prior environmental clearance under the EIA Notification 2006, consent to establish and operate from the State Pollution Control Board under the Air and Water Acts, and it must meet the emission standards for cement plants in the Environment (Protection) Rules. Most complaints are about fugitive dust from crushing, storage, packing and trucks rather than the main stack. Complain to the State Board's regional office, and where clearance conditions are being broken, to the Environment Ministry's regional office as well.

Short answer: Cement plants need environmental clearance, State Board consent and compliance with cement-specific emission standards. Dust from stockpiles, conveyors, packing and trucks is the most common breach. Complain in writing to the State Board's regional office, cite the plant's consent and clearance conditions (obtained by RTI), and take crop or property damage claims to the NGT within five years.

This guide is for villagers and residents living near a cement plant or a cement grinding unit, and for plant managers who want to understand where the legal risk sits. It explains how a cement works produces dust and gases, which permissions and standards apply, what the board and the Environment Ministry check, and how to build a complaint or a compensation claim that is taken seriously.

If you need help with a specific plant, our industrial air pollution lawyers act for affected villages and RWAs in complaints and NGT applications, and advise cement and grinding units on consents, clearance conditions and notices.

ClearancePrior environmental clearance under EIA Notification 2006
ConsentCTE and CTO from the State Board (Air and Water Acts)
StandardsCement plant emission standards in the EP Rules schedules
Compensation claimNGT section 15, within 5 years

हिंदी में सारांश

सीमेंट प्लांट को तीन स्तर पर अनुमति और मानकों का पालन करना होता है: EIA अधिसूचना 2006 के तहत पर्यावरण मंजूरी, राज्य प्रदूषण नियंत्रण बोर्ड से स्थापना और संचालन की सहमति, और पर्यावरण (संरक्षण) नियमों में सीमेंट उद्योग के उत्सर्जन मानक। ज्यादातर शिकायतें चिमनी से ज्यादा क्रशर, खुले भंडार, पैकिंग और ट्रकों से उड़ने वाली धूल को लेकर होती हैं। शिकायत राज्य बोर्ड के क्षेत्रीय कार्यालय में लिखित रूप में करें और RTI से प्लांट की सहमति और मंजूरी की शर्तें मंगाएं। फसल या संपत्ति के नुकसान का मुआवजा NGT में पांच साल के भीतर मांगा जा सकता है।

In short

The essentials

Three layers of control

Environmental clearance, State Board consent and cement-specific emission standards all apply.

Dust is the usual problem

Fugitive dust from handling, storage, packing and trucks causes more complaints than the kiln stack.

Conditions are your evidence

Consent and clearance conditions list the controls the plant promised; an RTI gets you both.

Two regulators

The State Board enforces consent; the Environment Ministry's regional office monitors clearance conditions.

Crop damage is claimable

Farmers can seek compensation and restoration from the NGT under section 15.

Online monitoring data

Large plants report stack data continuously to the regulators, and that data can be sought.

The direct answer

Where do I complain about dust from a cement plant?

Write to the regional office of the State Pollution Control Board that covers the plant. The board granted the plant its consent to operate under section 21 of the Air Act and section 25 of the Water Act, and it can inspect, monitor, issue directions and, under section 31A of the Air Act, order closure or disconnection of power. Ask specifically for an inspection of fugitive dust controls and for the plant's stack monitoring and online monitoring data.

If the plant has an environmental clearance, which every cement plant set up or expanded since the EIA Notification of 2006 should have, send a copy of your complaint to the Environment Ministry's regional office that monitors clearance conditions. Clearance letters for cement plants usually contain detailed conditions on dust control, green belts, truck movement and monitoring. A breach of those conditions is a separate violation, and the ministry's office can inspect and report on it. Our guide on EC conditions not being followed explains how that complaint works.

Copy the District Magistrate if dust is affecting a whole village or a school, because the DM can call a joint inspection and has public nuisance powers under section 152 of the BNSS. If crops, houses or water sources are being damaged and the authorities are not acting, the National Green Tribunal can order inspection, directions and compensation.

Where the dust comes from

How a cement plant produces dust and gases

A full cement plant is a long chain of dusty operations. Limestone is blasted and dug from a mine, crushed, stacked and blended, then ground with clay, iron ore and other additives in a raw mill. That raw meal is fed into a preheater tower and a rotary kiln, where it is burnt at very high temperature with coal or pet coke to make clinker. The clinker is cooled, stored, ground with gypsum and often fly ash or slag in a cement mill, and finally packed into bags or loaded in bulk.

Every transfer point in that chain can leak dust: crushers, conveyor junctions, open stockpiles of limestone, coal and clinker, mills, silos, the packing plant and the loading bays. Then there are the trucks and dumpers carrying limestone in and cement out, often on village roads not built for them. In most complaints we see, this fugitive dust is the real problem, not the main kiln stack.

The kiln and the coal mill produce the stack emissions: particulate matter, and gases such as sulphur dioxide and nitrogen oxides from burning fuel at high temperature. A standalone grinding unit, which only grinds clinker brought from elsewhere, has no kiln but still has mills, silos, packing and heavy truck traffic, so its dust problem can be just as serious for the colony next door.

Plant section by section

Which parts of a cement plant cause pollution, and what controls are expected

The exact requirements are in each plant's consent and clearance letters. This table gives the usual picture so you know what to look for.

Section of plantWhat escapesControls usually required
Limestone mine and crusherBlasting dust, crusher dust, vibrationControlled blasting, water spraying, enclosed crusher with dust extraction
Stockpiles (limestone, coal, clinker, fly ash)Wind-blown dustCovered sheds or enclosures, wind barriers, water sprinkling
Conveyors and transfer pointsDust at every drop pointCovered conveyors, dust extraction at transfer points
Raw mill, kiln and coal millParticulate matter, sulphur dioxide, nitrogen oxidesBag filters or electrostatic precipitators, stack of required height, continuous monitoring
Clinker cooler and cement millFine dustBag filters, sealed ducting
Packing plant and loading baysCement dust during bagging and truck loadingEnclosed packing, dust extraction, loading spouts
Trucks and internal roadsRoad dust, spillage, diesel exhaustPaved roads, wheel washing, covered trucks, road sweeping
The law

Which rules apply to a cement plant?

EIA Notification 2006

Cement plants need prior environmental clearance, with larger plants appraised at the central level and smaller ones by the state authority. Standalone grinding units also appear in the schedule. Expansion or change of product mix needs an amendment of the clearance first. The clearance comes with specific and general conditions, and six-monthly compliance reports must be filed.

Air Act s.21 and Water Act s.25

Consent to establish before construction and consent to operate before production, renewed periodically. Cement plants with kilns are generally placed in the red category, the most closely regulated; check the board's current list for grinding units.

Environment (Protection) Rules, 1986

The schedules contain emission standards specific to cement plants, covering particulate matter and gases such as sulphur dioxide and nitrogen oxides, with separate provisions where waste is co-processed in the kiln. The plant's consent will apply these standards and may add stricter conditions.

Hazardous Waste Rules, 2016

Cement kilns can use certain wastes as fuel or raw material (co-processing) only with authorisation and under the conditions set for it. Waste received must come with the required manifest.

Air Act s.31A and EP Act s.5

The State Board, and the central government or its delegate, can direct closure, prohibition or regulation of a plant and stoppage of power or water. A show-cause notice normally comes first.

NGT Act ss.14, 15 and 16

The NGT hears substantial environmental disputes (6 months), compensation and restoration claims (5 years), and appeals against clearances and board directions (30 days from communication), each with a possible extension of up to 60 days for sufficient cause.

Stack emissions

What the stack emission rules mean in practice

The emission standards for cement plants set the maximum concentration of particulate matter, sulphur dioxide and nitrogen oxides that may leave a stack, measured in milligrams per normal cubic metre. They differ for older and newer kilns and for plants that co-process waste. We do not quote the figures here because they are applied through each plant's consent, which may be stricter, and because the consent is the document you will actually rely on.

Large cement plants have been directed by the CPCB and State Boards to install online continuous emission monitoring on their main stacks, with data transmitted to the regulators. This matters to residents in two ways. First, if the online data shows repeated exceedances, the board already has the evidence and has less excuse for inaction. Second, gaps in the data, where the monitor was down for days, are themselves worth questioning. You can ask for the data and the board's record of exceedance alerts through RTI.

Stack exceedances are usually visible as darker or denser plumes, especially at start-up, during power trips or when a bag filter or electrostatic precipitator fails. Dated videos of such episodes, with the time noted, can be matched against the online data and the plant's own logbook.

Step by step

How to complain about cement dust so the complaint sticks

Cement companies are usually well organised and will answer a complaint with a file of compliance reports. Your complaint needs to be specific enough to survive that.

1

Pin down the source

Identify which part of the plant the dust comes from: stockpiles, packing plant, trucks, the stack. Note wind direction and times. A complaint about one section with clear evidence beats a general complaint about the whole plant.

2

Collect evidence over a few weeks

Take dated photos and videos of dust plumes, uncovered stockpiles, spillage from trucks and the layer on crops, roofs and water tanks. Keep samples of settled dust in clean sealed jars, labelled with date and place.

3

Get the plant's papers by RTI

Ask the State Board for the consent to operate, inspection reports, stack and ambient monitoring results and online monitoring exceedance records. Ask for the environmental clearance letter and the latest six-monthly compliance report as well.

4

Complain to the State Board

Write to the regional office citing the specific consent and clearance conditions that appear to be breached, attach the evidence, and ask for an inspection, ambient monitoring near the village and action under section 31A.

5

Copy the Environment Ministry's regional office

Where clearance conditions are involved, send a copy asking for verification of compliance with the named conditions.

6

Involve the DM and the panchayat

A gram sabha or panchayat resolution and a letter to the DM asking for a joint inspection show that this is a community problem.

7

Document crop or property damage

Get the patwari or agriculture department to record crop damage, and photograph damage to houses or water sources. This is the basis of any compensation claim.

8

Escalate to the NGT if needed

If the authorities do not act, file an application with the complaint record, RTI replies and damage evidence, asking for a joint committee inspection, directions and compensation.

The six-monthly compliance report is worth reading line by line. Plants sometimes describe controls that do not exist on the ground, and a photo that contradicts a sentence in the plant's own report is powerful evidence. Our page on EC compliance reports explains what these reports contain.

Farmers

Cement dust on crops: can farmers get compensation?

Yes, if they can show the damage and link it to the plant. Cement dust settling on leaves blocks light and can form a crust, and farmers near cement plants often report lower yields of vegetables, pulses and fodder. The NGT can award compensation and restoration under section 15 of the NGT Act, applying the polluter pays principle, within five years of when the cause of action first arose, plus up to 60 days for sufficient cause.

The weak point in most crop claims is proof. A claim that says the whole village lost half its crop, with nothing to back it up, will not go far. What works is a record made season by season: the patwari's or agriculture officer's inspection notes, photographs of dust-coated crops alongside the same crop further from the plant, yield records or mandi receipts compared with earlier years, and where possible a report on dust deposition or leaf samples from a recognised laboratory.

Farmers sometimes accept small private settlements from the plant without any written record of what was paid and for what. That is their choice, but it can make a later claim harder. If an offer is made, get advice first. Our page on compensation for pollution damage explains how these claims are built.

Illustration

A grinding unit, a highway and a colony downwind

Here's a made-up example. A cement grinding unit on the edge of a small town receives clinker and fly ash by truck and dispatches bagged cement. A colony of about 300 houses lies downwind. Residents complain of grey dust on terraces, constant truck traffic past a school and a white haze around the packing plant in the evenings.

The RWA files an RTI and gets the consent order and the clearance letter. Both require fly ash to be stored in closed silos, trucks to be covered and internal roads paved. Members photograph fly ash dumped in an open yard and uncovered trucks queuing on the service road. They complain to the State Board and the Environment Ministry's regional office, quoting the conditions by number.

The board inspects, finds the open fly ash yard and broken dust extraction at the packing plant, and issues a show-cause notice followed by directions with a deadline and a bank guarantee. The unit builds a covered shed and repairs the system. The RWA keeps photographing for three months and sends the board a short follow-up with fresh pictures, so the file does not close on a promise.

Fly ash and waste

Fly ash and waste fuels at cement plants

Many cement plants use fly ash from thermal power stations to make blended cement, which is good use of a waste product but brings its own dust risk. Fly ash is extremely fine. Open dumping in the plant yard or spillage from uncovered trucks can spread it widely, and the fly ash utilisation notification of December 2021 places obligations on power plants that supply it. Our guide on fly ash dumping rules covers those obligations.

Some kilns also co-process waste such as plastic, tyres, industrial sludge or refuse-derived fuel. This is permitted, but only with authorisation and under conditions on what waste may be burnt, how it is stored and how emissions are monitored. If you see waste arriving and being stored in the open, or smell burning plastic from a plant that is not authorised to co-process, ask the board for the authorisation and the manifests for the waste received.

Quick checks

Is the cement plant near you following the rules?

  • Does it have a current consent to operate and an environmental clearance covering its present capacity?
  • Are limestone, coal, clinker and fly ash stored under cover or inside enclosures?
  • Are conveyors covered and transfer points fitted with dust extraction?
  • Are trucks covered, internal roads paved and wheels washed before vehicles leave?
  • Is the green belt required by the clearance actually planted and maintained?
  • Does the stack plume turn dark at start-up or at night?
  • Is the plant co-processing waste, and does it hold the authorisation to do so?
  • Has it expanded capacity without an amendment to its clearance?
Expansion

Cement plant expansions and public hearings

Cement companies expand often, adding a kiln line, a grinding unit or a captive power plant. An expansion needs prior amendment of the environmental clearance and fresh consent, and for many projects a public hearing. The public hearing is the moment when villagers' objections go on the record before the expert committee, so it is worth preparing for properly. Our guide on objections at an EIA public hearing explains how to make them count.

If a plant has already expanded without amending its clearance, that is a serious violation, and the Supreme Court's recent decisions on post-facto clearance have changed the position more than once, so current advice is needed. See our guide on expansion without EC amendment.

The tribunal

Taking a cement plant to the NGT

The NGT hears cement plant matters regularly, and its usual first step is to constitute a joint committee, often of the CPCB, the State Board and the District Magistrate, to inspect and report. The report will be compared with your evidence, and you can file objections if it is thin or one-sided. If the committee confirms violations, the tribunal typically directs compliance within a time frame, and may impose environmental compensation on the polluter pays principle.

In cement dust cases that Advocate B.K. Singh has handled, the evidence that made the difference was rarely the stack data. It was the gap between the plant's own compliance report and the photographs: a report describing covered sheds next to a picture of an open clinker pile. That contradiction tends to move a joint committee faster than any expert opinion.

If you are appealing against an environmental clearance granted to a new cement plant, the route is an appeal to the NGT under section 16 within 30 days of the order being communicated. For an existing plant, an application under sections 14 and 15 is the usual route.

For plant managers

If you manage a cement plant or grinding unit

The complaints that become legal problems usually start with something simple: an open stockpile, a broken bag filter, trucks queuing on a village road. Keep a maintenance log for every dust collector, record sprinkling and road cleaning, and file honest compliance reports. A report that matches the ground protects you; one that does not becomes the other side's best exhibit.

If a show-cause notice or a closure direction arrives, reply within the time given with documents and photographs showing compliance. A closure direction under section 31A can be appealed to the NGT within 30 days. Our page on pollution board notices sets out how we handle these.

Related reading

Related guides

For the air quality numbers that boards and committees cite, see PM10 and PM2.5 standards explained. Blasting in limestone mines raises its own issues, covered in our guide on quarry blasting damage, and for steel units the companion guide on steel and rolling mill pollution applies.

FAQs

Frequently Asked Questions

Who do I complain to about a cement factory?

The regional office of the State Pollution Control Board. If clearance conditions are being broken, also write to the Environment Ministry's regional office.

Does a cement grinding unit need environmental clearance?

Standalone grinding units appear in the EIA Notification schedule, so check the current schedule for the unit's capacity. They also need State Board consent.

What category is a cement plant under pollution rules?

Cement plants with kilns are generally in the red category, the most closely regulated. Every cement unit needs consent to establish and consent to operate.

Can I get a cement plant's online emission data?

Yes. File an RTI with the State Board asking for online monitoring data and exceedance records for specific dates.

Can farmers claim compensation for cement dust on crops?

Yes. The NGT can award compensation under section 15 within five years, if the damage is documented and linked to the plant.

How do I prove cement dust damaged my crops?

Get the patwari or agriculture officer to record the damage, keep dated photos and yield records, and where possible get a laboratory report on dust deposits.

Is co-processing waste in a cement kiln legal?

Yes, with authorisation under the Hazardous Waste Rules and under the conditions set for it. Unauthorised burning of waste is a violation.

Can a cement plant run trucks through village roads all night?

Truck movement is often covered by clearance and consent conditions. Night noise and road damage can also be raised with the DM and the police.

Can the pollution board close a cement plant?

Yes. Under section 31A of the Air Act the board can direct closure and stop power or water, usually after a show-cause notice.

How long do I have to challenge a cement plant's environmental clearance?

An appeal to the NGT lies within 30 days of the order being communicated, extendable by up to 60 days for sufficient cause.

What should I do if the joint committee report favours the plant?

File objections pointing to your evidence and any gaps in the inspection, such as timing or sections of the plant that were not checked.

BK

About the author

Advocate B.K. Singh, Founder & Principal Advocate, MCA, LL.B., LL.M.

Advocate B.K. Singh has practised for more than twenty years before the Supreme Court, the High Courts and the National Green Tribunal, and leads the environmental practice from offices in Dwarka (New Delhi) and Vaishali (Ghaziabad) with Advocate Sadhna Singh. Read his profile.

Living with cement dust, or facing a board notice?

Send us photos, the plant's name and any papers you have on WhatsApp or by phone. We will tell you what the consent and clearance conditions allow and what to do next.

This page gives general information about environmental law as it stood when it was last reviewed. It is not legal advice on your case and does not promise any result. Laws, rules, fees and time limits change, so check the current position for your matter before acting.

Have a question about your own case?

A guide can only go so far. Send us the notice, the order or a few photos, and we'll tell you where you stand, which authority or NGT bench deals with it and when the next step is due, in plain words.

 +91-9315261599 Schedule Your Consultation